OCR Text |
Show PART VI FRAjMEWORK PLAN AND ALTERNATIVES Ta"ble 15 - Projected installed capacity and water depletions for thermal-electric power generation for the states' alternative to the framework plan (6.5 MAF level of development) Upper Colorado Region Installed capacity and consumptive use 1980 2000 2020 1,000 1,000 1,000 Subregion Mega- acre- Mega- acre- Mega- acre- and state watts feet watts feet watts feet Green River Colorado 663 9.1 4,663 69.I l+,663 69.I Utah 959 14.4 7,559 113.3 7,559 113.3 Wyoming 2,213 33.2 9,913 148.7 9,913 148.7 Subregion total 3,835 56.7 22,135 . 331.1 22,135 331.1 Upper Main Stem Colorado 123 1.6 1,123 16.6 1,123 16.6 Subregion total 123 1.6 1,123 16.6 1,123 16.6 San Juan-Colorado Arizona 2,310 34.1 2,310 34.1 2,310 30.1 Colorado 0 0 1,500 22.5 1,500 22.5 New Mexico 5,623 90.0 5,623 90.0 5,623 55.6 Utah 7,400 111.0 9,900 148.5 9,900 148.5 Subregion total 15,333 235.1 19,333 295.1 19,333 256.7 Arizona Colorado New Mexico Utah Wyoming Region total 2,310 34.1 2,310 1 2,310 30.1 786 10.7 7,286 108. 2 7,286 108.2 5,623 90.0 5,623 90. 0 5,623 55.6 8,359 125.-4 17,1+59 261. 8 17,459 261.8 2,213 33.2 9,913 148. 7 9,913 148. T 19,291 293.4 1+2,591 642.8 1+2,591 6oh.h 83 |