| OCR Text |
Show 159 atorr!:ic pclygon geeraticn, te flexible list str=tu:e5 reicn into icividual rings as shewn in fiqwre 6.7. There Ooe the rins design regions have been designee, each of :err. can be sliced into rins. The operator seifie5 the orientation, initial pcsition, steppinq directi, ana step size (i.e. tt-.ickness) fer a cutting Flae. Te slicing procedre then cuts up the design rray be up to several hundred rings in a stope. Using these rccedures and the ore reserves program, the rinqs car. be designed and accurate reserves calculated for a whole stope in several hours (the ore reserve program runs at night sice no user interaction is required). To obtain the sae kid of results by rraual ethods could easily take several Te 5KEL task to layout te drilling and 20ecifv - - the loading for the clast holes for each ring is still uder ceveloprrent. Also under cievelornent is a laree 5 ::' S ': e r. 0 f pre 9 r Q IT, S to s C e c ''': 1 e an': IT 0 r. ito r the roc u c t i O!! cf the rr.ine. c . S : in i !"J S S :_: s t err S u rr.rr. a r y |