OCR Text |
Show TABLE 5.6 Optimization model Results Reservoirs in Parallel - Millcreek and Avon ROWS Row At Activity Lower Limit Upper Limit Dual Activity OBJFN BS .901 1.0000 TSC01 UL 70.086 .000 70.086 -. 0028 TSC02 BS 12.833 .000 33.400 .0000 FAS01 BS 0.000 0.000 .0000 FAS02 BS 0.000 0.000 .0000 DSC01 LL .200 .200 .800 .3279 DSC02 LL .200 .200 .800 .5705 GSC01 SBS 1.217 .000 10.000 -. 0034 GSC02 LL .000 .000 10.000 - 14629.4027 TOTM& I01 BS 6.600 6.558 10.000 .0000 TOTIRR01 25.825 25.825 30.000 .0329 COLUMNS Column At Act'vUv Lower Limit Upper Limit Reduced Cost DS01 BS 14.017 .000 56.069 .0000 DS02 BS 2.567 .000 26.720 .0000 MI0101 BS 4.100 3.500 6.500 .0000 MI0201 LL 2.500 2.500 4.500 -. 0319 IR0101 BS 19.825 19.000 25.000 .0000 IR0201 LL 6.000 6.000 8.000 -. 0426 HOI LL .000 .000 37.126 -. 0744 H02 LL .000 .000 14.851 -. 1061 Legend: BS m Basic, LL = Lower Limit, UL = Upper Limit, SBS = Superbasic 134 |