OCR Text |
Show s fall of 1933 and the same C. C. C. camp that was located there built a series of channel aoatrol structures on the Virgin near the Washington Fields At St Geors- 3 one CC. C, canp devoted its time during the fall and winter of 1933 to the building of a series of channel control structures on the Santa Clara and the erection of a flood control structure near the Shivwitts Reservoir* ADDITIONAL FLOOD CONTROL WORK NEEDED In the vicinity of St, George it la desirable that the work begun in 1953 te serried on to completion- Thia Tould include s. dditlcr, al height to the flood control equalising: reservoir on ttie Santa Clara Creek above Shivwitts and the completion of channel control structures along the lower extrexnitlea of Santa Clnrti Greek, where the most valuable lends in the vicinity of St* George are in danger of being washed away* Tliere la elao need for additional work on the Virgin % ver whero the rbanrr. 1 may readily be held rithir. hounds end nay be prevented from r. x> rcsadiug over fans land* In the vicinity,, There ia also need for additional x* or>: en the Virgin Ritor near Poolrrillla end at ** rafton and Sprii » £ dale< At Cedar City the Coel Creek whould be placed under control by building s barrier near the mouth cf the canyon and thor* ir . also need for additianel work at Fiddler** Creak and at Welkera neaT Summit, To tha Went of Gedar City the tewn of Enterprise ia In jeopards of being badly floodsd from the main drainage area extending Vest toward the !&;* vada line 7f>.? atreur bed in tlie vicinity of the town baa been completely filled vith send and gravel., The condition cry b< s corrected by building a flood control barrier on the main amah r. e « r th? M |