OCR Text |
Show [24] fornia, and were supervised in the field by W. W. Gage, Engineer. The field personnel consisted of: G. H. Gremmels Engineer J. L. Kunken Engineering Aide Leonard S. Hough Engineering Aide Vincent Scott Engineering Aide Shephard Crook Engineering Aide Morris Phillips Laborer John Aspa Laborer Water Resources data was compiled by D. K. Johnson, Engineer, of the Office of Project Planning, Region 3. The report and appendixes were prepared by H. A. Manin, Engineer, of the Office of Project Planning, Phoenix, Arizona. The investigations of the Colorado River Reservation problem were under the direction of C. H. Southworth, District Irrigation Engineer of District 4, Office of Indian Affairs. R. H. Rupkey, Hydraulic Engineer, assisted in initiating the investigations and in preparation of the final report. R. G. Hornberger, Electrical Engineer, made the designs for the power plants at Headgate Rock Dam and the Rock Drop Site and supervised the canal studies conducted by the Office of Indian Affairs. Engineers R. Russell, H. V. Wingfield and A. H. Gardner assisted in the preparations of the studies and estimates. |
Source |
Original book: [State of Arizona, complainant v. State of California, Palo Verde Irrigation District, Coachella Valley County Water District, Metropolitan Water District of Southern California, City of Los Angeles, California, City of San Diego, California, and County of San Diego, California, defendants, United States of America, State of Nevada, State of New Mexico, State of Utah, interveners] : |