OCR Text |
Show [33] d. Cost Estimates A summary of the above estimates for each route, based on deliveries as shown, follows: Main Route 1,000 cf. s. 1,500 cf. s. Canal construction Headworks Highway Bridge Siphons 34 Siphon and wasteway Power drop (Drop plus power feature) Highway relocation 1.7 miles Total 15% contingencies $ 5,020,649 $ 5,803,138 230,265 230,265 22,924 22,924 5,357,312 5,357,312 234,445 234,445 1,235,300 1,235,300 10,659 10,659 $12,111,554 $12,894,043 1,816,733 1,934,106 Field Cost $13,928,287 $14,828,149 10% Engineering & overhead 1,392,829 1,482,815 Total 1946 costs Investigations-Surveys Right-of-way Total $15,321,116 $16,310,964 50,000 50,000 19,400 19,400 $15,390,516 $16,380,364 |
Source |
Original book: [State of Arizona, complainant v. State of California, Palo Verde Irrigation District, Coachella Valley County Water District, Metropolitan Water District of Southern California, City of Los Angeles, California, City of San Diego, California, and County of San Diego, California, defendants, United States of America, State of Nevada, State of New Mexico, State of Utah, interveners] : |