| OCR Text |
Show 24 Included net tons. 1,600, 000 was one open-hearth furnace with facilities, two over-head traveling furnace, necessary This facilities. andIts facilities were Geneva's furnaces to placed a one two-hole open-hearth furnaces to total of sixteen. a storage total of ten, All of these operation shortly before the in soaking pit and additional material building extensions, brings soaking pit cranes, auxiliary new recent nationwide steel strlke. Another is a facility which Geneva has had under construction mill for the production of hot-rolled sheets from coil, and heavier, production This new of a a maximum size of will be at the rate of facUity cause with has not 'Shortage yet been x 240". approximately placed in 100, 000 net operation tons annually. (February, 1953) 38 be- Walther Mathesius in December, operations of the U. S. Steel Corporation Columbia-Geneva Division of U. S. Steel under the It is estimated that of the necessary semi-finished steel. With the retirement of Dr. Western 72" l6-gauge supervision was of Mr. Alden Roach. named Vice President in charge were reorganized. 1951, The established, and placed Mr. Loren J. of the Geneva Westhaver was operations. Rema rks by Dr. Walther Mathesius, President, Geneva Steel Co., before the Payson Chamber of Commerce at Payson, utah, January 25, 1951. |