| Title |
Colorado River Storage Project, Contract for electric service to Cedar City, Utah |
| Description |
Copies of 1970 contract to supply Cedar City, Utah, with hydropower from the Colorado River Storage Project, with related documents and correspondence |
| Subject |
Colorado River Storage Project; Electric power--Utah--Cedar City; Waterpower--Utah--Cedar City |
| Creator |
United States. Bureau of Reclamation. Region 4 |
| Contributor |
California-Pacific Utilities Company; Southern Utah Power Company |
| Alternate Title |
Contract for electric service to Cedar City, Utah |
| Additional Information |
Includes signed and unsigned copies of the contract; "General power contract provisions, effective April 27, 1961"; Rate scheducles of California-Pacific Utilities Company; Questions and answers from May 3, 1967, concerning Storage Project power; Cedar City ordnance no. 120 granting to Southern Utah Power Company an electric light, heat, and power franchise on Feb. 19, 1953 |
| Spatial Coverage |
Cedar City (Utah); Colorado River (Colo.-Mexico) |
| Collection Number and Name |
Accn0823 bx 30 fd 7; John S. Boyden Papers |
| Rights Management |
Digital Image Copyright 2009, University of Utah. All Rights Reserved. |
| Holding Institution |
J. Willard Marriott Library, University of Utah |
| Date |
1953; 1961; 1967; 1970 |
| Digitization Specifications |
Original scanned on Epson Expression 10000 XL and saved as 400 ppi TIFF. Display image generated in CONTENTdm. |
| Publisher |
Digitized by J. Willard Marriott Library, University of Utah |
| Type |
Text |
| ARK |
ark:/87278/s6513x5z |
| Setname |
wwdl_neh |
| ID |
1147943 |
| Reference URL |
https://collections.lib.utah.edu/ark:/87278/s6513x5z |
| Title |
Page 32 |
| Setname |
wwdl_neh |
| ID |
1147905 |
| OCR Text |
Show assure the accumulation of a Basin Fund large enough to permit the earliest practicable development of participating projects of the Colorado River Storage Project in accordance with the spirit and intent of Public Law 485 (70 Stat. 105) under which the Project was authorized. AUXILIARY POWER SERVICE 9. When power and energy from any other source is used by the Contractor, auxiliary or supplementary to or incanjunction with power and energy contracted for hereunder, authorized representatives of the Contractor and the contracting officer, prior to such use, shall enter into a written operating agreement defining the procedures by which the amount of power and energy supplied by the United States will be determined. Such procedures shall be developed in conformity with the following principles: (1) The United States will be obligated to furnish, and the Contractor shall be entitled to receive, firm power in any billing period up to the then effective contract rate of delivery and an amount of energy in this period up to the energy obligation as stated in Article 7(d), "Electric Service to be Furnished," unless larger quantities are agreed upon by authorized representatives of the Contractor and contracting officer, (2) The Contractor shall be obligated to pay for power and energy in each billing period, in accordance with Article 8 hereof, "Schedule of Rates," The quantities of energy deemed to be furnished, and to be paid for, shall be the quantities metered to or scheduled to the Contractor by Article 9 |
| Reference URL |
https://collections.lib.utah.edu/ark:/87278/s6513x5z/1147905 |