| OCR Text |
Show 4b. 1. RECONSTRUCTION as described in drawings prepared by JHCH Architects, St. George, 1995, with the exception of a concrete masonry product used for the exterior wythe in lieu of stabilized adobe • • concrete masonry not compatible with adobe masonry (different physical properties likely to result in damage to adobe) not reconstructed with traditional/historically correct building materials and techniques (inadequate to keep building eligible for listing on the National Register of Historic Places) PROBABLE COST is not a detailed estimate or a contractor's bid. Figures are based on comparable costs for similar, relevant projects. 2 . PROBABLE LIFE figures are based on observed decay at the Grafton Church/School and similar structures, and the performance of similar stabilized and/or rehabilitated structures. |