Show (19,000 acre-feet) would accumulate behind Soldier Creek Dam and would jiot be usable for diversion to_J5ojmev_ille Basin for at least 10 years. Item, Construction Costs Costs expended to 9/30/77 $141,157,000 Costs to terminate contracts Vat Tunnel 4,560,000 Stillwater Tunnel ? 1,300,000 Rock Creek Road 158,000 Currant Creek Road 7,000 Upper Stillwater Dam 3,400 West Fork Access Road 7,500 Strawberry Tunnel Rehabilitation 6,400,000 Provo Reservoir Canal Rehabilitation 7,490,000 Vat Tunnel Soils Riprap 750,000 Total $161,832,900 b. Alternative of Completing Vat Tunnel, Vat Diversion Dam, and Feeder Pipeline The second partial construction available on Septemer 30, 1977, to make the project useful would be to complete Vat Tunnel, Vat Diversion Dam, and Feeder Pipeline enabling flows of West Fork Duchesne River to be diverted in to Strawberry Aqueduct. The sources of supply to Strawberry Reservoir under this alternative are summarized below. Source of Supply Acre-feet Provided West Fork Duchesne River 22,900 Currant Creek . 15,800 Layout Creek 1,300 Water Hollow 2,900 Soldier Creek Drainage 19,000 Share of Strawberry Reservoir Evaporation 15,900 Subtotal 46,000 |