OCR Text |
Show Table 10 FRAMEWORK PR0C21AM RESPONSE TO PROJECTED REQUIREMENTS Lover Colorado Region 1966-1980 Major Program Elements Unit Projected Require-*- Program Percent Remaining ments Response Response Needs I90I-2OOO 2001-2020 Projected Require- Program Percent Remaining ments Response Response Needs Projected Require- Program Percent Remaining ments Response Response Needs Regional Water Supply 1/ Municipal and Industrial Water Supply Development Flood Damage Prevention Erosion Damage Reduction Wildfire Damage Reduction Irrigation Development Recreation Development Fish and Wildlife Development Sport Fishing Hunting Electric Power Development Energy Peak Demand 1,000 Acre-Feet 1^,895 14,900 14,460 kko 16,154 15,984 170 1,000 Acre-Feet 837 837 100 - 1,670 1,670 100 - 2,738 2,738 100 -- $ Million 73 32 44 41 152 102 67 50 310 242 78 68 $ Million 10.6 2.4 23 8.2 16.6 9.6 58 7.0 24.1 17.8 74 6.3 $ Million 8.5 1.1 13 7.4 12.9 3.2 25 9.7 20.0 8.0 40 12.0 1,000 Acres 200 200 100 - 168 168 100 - 132 132 100 - Million Recreation Days 144 51 35 93 221 119 54 102 307 115 37 192 Million Man-Days Million Man-Days 9.7 2.1 9.7 2.1 100 100 0 0 15.1 3.5 15.1 3.5 100 100 0 0 26.0 5.1 26.0 5.1 100 100 0 0 1,000 gigawatt-hours 1,000 megawatts 43 8 43 8 100 100 0 0 186 36 186 36 100 100 0 0 565 108 565 108 100 100 0 0 1/ Amount required to meet all obligations of the "Law of the River," Mexican Treaty, losses, and regional consumptive uses 13, *1Q 9D 1,^5 9? 99 |