OCR Text |
Show 41 Construction was begun in August, 1924, and water was first impounded on May 27, 1927. Although built by the Salt River Valley Water Users' Association, title is in the United States.46 7. Mormon Flat Dam. Situated on the Salt River 37 miles northeast of Phoenix, Arizona, this concrete variable-radius arch type dam has a structural height of 224 feet and a hydraulic height of 142 feet. Its reservoir, with a capacity of 57,852 acre-feet, is utilized to irrigate the Salt River Project. The dam has an open channel spillway with a capacity of 150,000 c.f.s. and a 7,000 kw. power plant has been constructed at its toe. Construction was initiated in February 1923, water was first impounded on January 13, 1925, and the first power was generated on May 19, 1926. Built by the Salt River Valley Water Users' Association, title is held by the United States.47 8. Stewart Mountain Dam. This concrete variable-radius arch type dam, with a structural height of 207 feet and a hydraulic height of 116 feet, is located on the Salt River 29 miles northeast of Phoenix, Arizona. Its reservoir, with a capacity of 69,765 acre-feet, provides irrigation water for the Salt River Project. The dam has a power plant with a capacity of 10,400 kw. and its open channel spillway has a capacity of 150,000 c.f.s. Construction was initiated on October 1, 1928, water was first impounded on February 22, 1930, and power was first generated on March 8, 1930. Title to the dam, which was built by the Salt River Valley Water Users' Association, is held by the United States.48 *6Ariz. Ex. 1000, p. 24. *7Ariz. Ex. 1000, pp. 24-25. 4SAriz. Ex. 1000, p. 25. |
Source |
Original Report: State of Arizona, complainant v. State of California, Palo Verde Irrigation District, Imperial Irrigation District, Coachella Valley County Water District, Metropolitan Water District of Southern California, City of Los Angeles, California, City of San Diego, California, and County of San Diego, California |