OCR Text |
Show PART IV FUTURE DEMAND Table 45 - Projected costs for Federal irrigation developments (Unit--$1,OOO) 1966-1980 1981-2000 2001-2020 Annual Annual Annual operation, operation, operation, maintenance, maintenance, maintenance, Instal- Instal- and re- Instal- and re- Instal- and re- lation lation placement lation placement lation placement costs Specific-use Costsi' Green River 31,110 350 31+, 1+80 1+30 15,150 210 80, 7I+0 Upper Main Stem 1+5,930 520 37,560 1+70 19,820 270 103,310 San Juan-Colorado 91,970 1,030 78,520 980 12,050 170 182,51+0 Total 169,010 1,900 150,560 1,880 1+7,020 650 366,590 Joint-use Costsfy Green River 32,800 10,000 33,200 76,000 Upper Main Stem 92,300 30,900 7,700 130,900 San Juan-Colorado 1+9,800 12,500 0 62,300 Total I7i+,9OO 53,^00 1+0,900 269,200 !_/ Includes specific items definitely identified with irrigation such as main and secondary laterals, pumping plants, some main canals, and other items not listed in other tables. (0M&E costs predominantly non-Federal.) 2/ Includes irrigation's prorated share of costs of multipurpose facilities such as reservoir storage, collection systems for reservoirs, and most main water conveyance systems. Also includes some non-Federal joint-use costs included in Table hh. Joint operation, maintenance, and replacement costs for all major functions total $2,1+76,000, of which irrigation's share would be approximately $817,000 annually (predominantly non-Federal). 89 |