OCR Text |
Show PART IV FUTURE DEMAND Table 38 - Projected on-farm drainage required for presently irrigated lands 1966-1980 19til-2000 2001-2020 Total Cost ($1,000)2/ Cost ($1,000)2/ Cost ($1,000 )£J Hydrologic Lands needing Drains (tile and Installation Annual operation, maintenance, Lands needing Drains (tile and Installation Annual operation, maintenance, Lands needing Drains (tile and Installation Annual operation, maintenance, Lands needing Drains (tile and Installation cost ($1,000)2/ Subregion and State drtainagel/ (acres) ditches) (miles) Federal Non-Federal and replacements/ drainage^/ (acres) ditches) (miles) Federal Non-Federal and replacements/ drainage!/ (acres) ditches) (miles) Federal Non-Federal and replacements/ drainage-?/ (acres) ditches) (miles) Federal Non-Federal Green River Colorado Wyoming Utah 5,750 15,575 18,150 52 146 170 274.6 770.9 897.6 274.6 770.9 897.6 5.6 15.4 17.8 11,500 31,150 36,300 105 292 340 554.4 1,541.7 1,795.2 554.4 1,541.7 1,795.2 11.0 30.8 35.8 5,750 15,575 18,150 52 146 170 274.6 770.9 897.6 274.6 770.9 897.6 5.6 15.4 17.8 23,000 62,300 72,600 209 584 680 1,103.6 3,083.5 3,590.4 1,103.6 3,083.5 3,590.4 Subtotal 39,475 368 1,943.1 1,943.1 38.8 78,950 737 3,891.3 3,891.3 77.6 39,475 368 1,943.1 1,943.1 38.8 157,900 1,473 7,777.5 7,777.5 Upper Main Stem Colorado Utah 27,125 625 260 6 1,372.8 31.7 1,372.8 31.7 27.4 .6 54,250 1,250 500 12 2,64o.O 63.4 2,640.0 63.4 52.8 1.2 27,125 625 260 6 1,372.8 31.7 1,372.8 31.7 27.4 .6 108,500 2,500 1,020 24 5,385.6 126.8 5,385.6 126.8 Subtotal 27,750 266 1,404.5 1,404.5 28.0 55,500 512 2,703.4 2,703.4 54.0 27,750 266 1,404.5 1,404.5 28.0 111,000 1,044 5,512.4 5,512.4 San Juan-Colorado Arizona Colorado New Mexico Utah 750 36,750 3,750 750 7 3^5 35 7 37.0 1,821.6 184.8 37-0 37.0 1,821.6 184.8 37.0 0.8 36.6 3.8 .8 1,500 73,500 7,500 1,500 14 690 70 14 74.0 3,643.2 369.6 74.0 74.0 3,643.2 369.6 74.0 1.4 72.8 7.2 1.4 750 36,750 3,750 750 7 345 35 7 37-0 1,821.6 184.8 37-0 37.0 1,821.6 184.8 37.0 .8 36.6 3.8 .8 3,000 147,000 15,000 3,000 28 1,380 140 28 148.0 7,286.4 739.2 148.0 148.0 7,286.4 739.2 148.0 Subtotal 42^000 394 2,o6o.4 2^050.4 42.0 84,000 788 4,160.8 4,160.8 82.8 42j000 394 2,080.4 2,080.4 42.0 168,000 1,576 8,321.6 8,321.6 Total 109,225 1^026" 5,428.0 5,428.0 108.8 218,450 2,037 10,755.5 10,755.5 214.4 109,225 1,028 5,428.0 5,42bi.b 108.8 436,900 4,093 21,611.5 21,611.5 1/ Source: SCS 2/ 1965 prices. 3/ Non-Federal Conservation costs. Needs printout data. |