Title |
War for the Colorado River Volume II; Above Lee's Ferry |
Creator |
Terrell, John Upton |
Subject |
Water rights; Water resources development; Water resources development -- Law and legislation; Rivers |
OCR Text |
Two volumes describing the California-Arizona controversy over the Colorado River. Part One - Hungry Horse Prediction; Part Two - January on Capitol Hill; Part Three - The Ides of March; Part Four - A Stacked Committee; Part Five - Hi Ho, Aqualantes; Part Six - Bananas on Pike's Peak; Part Seven - Dollars into Dust |
Publisher |
The Arthur H. Clark Company |
Date |
1966 |
Type |
Text |
Format |
application/pdf |
Digitization Specifications |
Pages were scanned at 400 ppi on Fujitsu fi-5650C sheetfed scanner as 8-bit grayscale or 24-bit RGB uncompressed TIFF images. For ContentDM access the images were resampled to 750 pixels wide and 120 dpi and saved as JPEG (level 8) in PhotoShop CS with Unsharp Mask of 100/.3. Foldout pages larger than 11" x 14" were captured using a BetterLight Super 8K-2 digital camera back on a 4x5 view camera (100mm Schneider APO lens). Oversize images were resampled to 1500 pixels wide. Optical Character Recognition (OCR) by ABBYY FineReader 7.0 with manual review. |
Language |
eng |
Relation |
Western Waters Digitial Library |
Rights Management |
Digital Image Copyright 2005, Marriott Library, University of Utah. All Rights Reserved. |
Holding Institution |
J. Willard Marriott Library, University of Utah |
Source Physical Dimensions |
Book 2 v. maps. 24 cm. |
Scanning Technician |
Backstage Library Works - 1180 S. 800 E. Orem, UT 84097. |
Call Number |
LC: KF5590.C6 |
ARK |
ark:/87278/s64t6h83 |
Setname |
wwdl_books |
ID |
1130135 |
Reference URL |
https://collections.lib.utah.edu/ark:/87278/s64t6h83 |
Title |
page 266 |
OCR Text |
Appendix C MAIN FEATURES OF THE COLORADO RIVER STORAGE PROJECT On December 15, 1950, E. O. Larson, Regional Director at Salt Lake City for the Bureau of Reclamation, submitted his report on the proposed Colorado River Storage Project (No. 4-8a. 81-1, 1950). The Larson report was sent to the Secretary of the Interior on December 22, 1950, by Michael W. Straus, Commissioner of Reclamation, with the recommendation that it be approved. On January 26, 1951, the report was approved by Oscar L. Chapman, Secretary of the Interior. The features of the proposed Colorado River Storage Project were changed many times before the development was finally signed into law in April 1956. The Reclamation Bureau reports which followed the original 1950 report differed, and the several project bills introduced in the House and Senate differed. The chief variations of the reports and bills are set down here in the order in which they appeared. Report of the Reclamation Bureau, December 1950: POWER DAMS (10) PARTICIPATING PROJECTS (12) Initial Construction Already Authorized Echo Park 525 feet. Eden Flaming Gorge 440 feet Paonia Glen Canyon 580 feet. fo Be Constructed Navajo 335 feet Central Utah Whitewater 255 feet Emery County Later Construction Florida Cross Mountain 295 feet Hammond Crystal 305 feet. La Barge Curecanti 475 feet. Lyman Gray Canyon 445 feet. Pine River Extension Split Mountain 245 feet Seedskadee Silt Smith Fork |
Format |
application/pdf |
Identifier |
268-UUM-WarColo2_page 266.jpg |
Source |
Original Book: War for the Colorado River, Vol. 1 |
Setname |
wwdl_books |
ID |
1130078 |
Reference URL |
https://collections.lib.utah.edu/ark:/87278/s64t6h83/1130078 |