| OCR Text |
Show (Attach V x 5 REGION Bllck *nd wnite rnoTo'grapa/---------^r( KM*______PARK/AREA NAME ZION NATIONAL PARK STRUCTURE NAME 1590 Pine Creek Bridge___________STRUCTURE NUMBER 998 LOCATION OF STRUCTURE Pine Creek Bridge castoraNATIONAL REGISTER____________DATE: HPS LEGAL INTEREST PARK NUMBER / / PARK LOCATION CODE PG MANAGEMENT CATEGORY: (A) (B) (C) (D) FEE_________________MANAGEMENT AGREEMENTS Mgnt. Agreement Check all of the following categories for which NFS has treatment responsibility: Stabilization01 Cyclic Maintenance^ Routine Maintenance*) Approved Ultimate Treatment 60 (ROCKY MOUNTAIN REGION USE ONLY) APPROVED ULTIMATE TREATMENT OR RESOURCE MANAGEMENT PLAN, CULTURAL COMPONENT DESIGNATION; Preservation (PP) Restoration (RR) Reconstruction (CC) Adaptive Preservation (AP) Adaptive Restoration (AR) Adaptive Reconstruction (AC) Neglect (MG) Remove (RM) No Approved Treatment (NO) Approval Document_____( )Document Date: Estimated Treatment Costs Level of Stabilisation: Approved Treatment: $_______Bete: $_______Date: / / / / / / Estimate: (A) (B) (C) Estimator: (Region) (DSC) (A4E) STATEMENT OF SIGNIFICANCE: .Sandstone ashlar, single arch span, highway bridge of architectural and historical significance. Date of Construction: 07/ 0^1930 Date of Alterations: - I I Architect/Designer: Thos. Vint/ *r.qvin Historical Theme (s): Transportation History of Structure: In Feb. 1928, Chief Landscape Engineer, Thomas C. Vint, and Bridge Engineer from the Regional Office, Mr. Xngwin, made inspections of the bridge sites on the Zion-Mt. Carmel Highway which was in the process of construction by the U.S. Bureau of Public Works. Work on the Pine Creek Bridge, which was under the ultimate supervision of Chief, Thomas H. MacDonald, lagged behind highway construction due to design difficulties. Although open for the Dedication on 4th, ooapleted late July. Evaluation of Structure:Historic Theme Contributint x"Eon-Contributing National Register Criteria: A B_ CJfD_ (Include integrity statement) Built of native sandstone, ashlar "masonry and designed to compliment its natural surroundings, this bridge is a superb example of "NFS-Rustic" stone bridge engineering. Furthermore, the bridge is unaltered and retains structural integrity. Bibliography:Scoyen, E.T. "ZNP Annual Report for 1930." Scoyen. "2NP Superintendent's Monthly Reports, Feb., Oct., 1928." Exell, Devey. Interview by Kathy Andrews, 1982, ZNHA. Representation in Other Surveys: Olivieri, Lance. "Classified Structure Field"" Inventory Report, 1978." If structure has been removed, how? .___ Date; II Report prepared by: j«m»« Juraig___________________Date: 09/27/1984 |