| OCR Text |
Show -uAooi-r i.£^i dijvuVtfiutu* r j.-c.-ui-' ,u.iv£*t.t.wixi. i\*»*wtt.i. S 4 "t) D H * (Attach 4" x 5" Black and White Photograph) REGION RMR______PARK/ AREA NAME 2ion National Park STRUCTURE NAME Virgin River Bridge PARK NUMBER 1590 STRUCTURE NUMBER LOCATION OF STRUCTURE Virgin River Bridge . NATIONAL REGISTER____________DATE: ~* ' ? PARK LOCATION CODE PG / / MANAGEMENT CATEGORY: (A) (B) (C) (D) NPS LEGAL INTEREST____FEE__________________MANAGEMENT AGREEMENT; No Mont. Aoreeme Check all of the following categories for which NPS has treatment responsibility: Stabilization 0& Cyclic Maintenance® Routine Maintenance (i Approved Ultimate Treatment & (ROCKY MOUNTAIN REGION USE ONLY) APPROVED ULTIMATE TREATMENT OR RESOURCE MANAGEMENT PLAN, CULTURAL COMPONENT DESIGNATION Preservation (P?) Restoration (RR) Adaptive Preservation (AP) Adaptive Restoration (AR) Neglect (NG) Remove (RM) Reconstruction (CC) Adaptive Reconstruction (AC) No Approved Treatment (NO) Approval Document Estimated Treatment Costs Stabilization: Approved Treatment: ____________ ( )Document Date: / / __________ Level of $_______Date: / / Estimate: (A) (B) (C) $_______Date: / / " Estimator: (Region) (DSC) (A&E) STATEMENT OF SIGNIFICANCE: Service built highway bridge of architectural and historical significance. Date of Construction: Q?/ OV 1930 Date of Alterations: 19 /SQ /1Q6Q Architect /Designer; Thos. vint/ Anovin Historical Theme(s): Transportation History of Structure: In Feb. 1928 , Chief Landscape Engineer, Thomas C. Vint and Bridge Engineer from the Regional Off ice , Mr. Angwin.made inspections of the bridge sites on the 2ion-Mt. Carmel Highway which was in the process of gnngt-nietion. wnr-v on the Virgin R. Bridge lagged behind due to landscape design difficulty and eonstmgtion finially commenced in October 1929. Although open for the Highway Dedication Ceremony on the 4th, the Bridge was not completed until the end of July. Widened .:T.IQSQ . Evaluation of Structure: Historic Theme Contributing ^ Non-Contributing __ National Register Criteria: A_ B_ CX D_ (Include integrity statement) Although partially reconstructed in 1960 , the Virgin River Bridge retains its structur*" al integrity. Attractive and well executed , the bridge is a 3 span "I" beam structure which was skillfully camouflaged with 54" Redwood slabs to give it a rustic finish. Bibliography: Scoyen, E.T. "ZNP Annual Report for 1930" , Scoven, E.T. "ZNP Superintendent's Monthly Reports , Feb., Oct. , 1928." Jolley, D.J. '? Report to Supt. ,10/1929 ? Representation in Other Surveys: Olivieri, Lance. "Classified Structure Inventory Report, 1978."____________________________________________________ If structure has been removed, how? ___________________Date: / / Report prepared by: James Jurale___________________Date: 09 / 26/ 1984 |