OCR Text |
Show (b) During the remaining months of the year the prescribed rate of delivery shall be not less than 1,125 cubic feet (31.9 cubic meters) nor more than 4,000 cubic feet (113.3 cubic meters) per second. Should deliveries of water be made at a point on the land boundary near San Luis, Sonora, as provided for in Article 11, such deliveries shall be made under a sub-schedule to be formulated and furnished by the Mexican Section. The Quantities and monthly rates of deliveries under such sub-schedule shall be in proportion to those specified for Schedule I, unless otherwise agreed upon by the Commission. Schedule II Schedule II shall cover the delivery at the boundary line by means of the All-American Canal of 500,000 acre-feet (616,745,000 cubic meters) of water each year from the date Davis dam and reservoir are placed in operation until January 1, 1980 and the delivery of 375,000 acre-feet (462,558,000 cubic meters) of water each year thereafter. This schedule shall be formulated subject to the following limitations: With reference to the 500,000 acre-foot (616,745,000 cubic meter) quantity: (a) During the months of January, February, October, November and December the prescribed rate of delivery shall be not less than 300 cubic feet (8.5 cubic meters) nor more than 2,000 cubic feet (56.6 cubic meters) per second. (b) During the remaining months of the year the prescribed rate of delivery shall be not less than 500 cubic feet (14.2 cubic meters) nor more than 2,000 cubic feet (56.6 cubic meters) per second. With reference to the 375,000 acre-foot (462,558,000 cubic meter) quantity: (a) During the months of January, February, October, November and December the prescribed rate of delivery shall be not less than 225 cubic feet (6.4 cubic meters) nor more than 1,500 cubic feet (42.5 cubic meters) per second. (b) During the remaining months of the year the prescribed rate of delivery shall be not less than 375 cubic feet (10.6 cubic meters) nor more than 1,500 cubic feet (42.5 cubic meters) per second. B. The United States shall be under no obligation to deliver, through the All-American Canal, more than 500,000 acre-feet (616,745,000 cubic meters) annually from the date Davis dam and reservoir are placed in operation until January 1, 1980 or 103 |