OCR Text |
Show limitrophe section of the river, its location, design and construction shall be subject to the approval of the Commission. The Commission shall thereafter maintain and operate the structure at the expense of Mexico. Regardless of where such diversion structure is located, there shall simultaneously be constructed such levees, interior drainage facilities and other works, or improvements to existing works, as in the opinion of the Commission shall be necessary to protect lands within the United States against damage from such floods and seepage as might result from the construction, operation and maintenance of this diversion structure. These protective works shall be constructed, operated and maintained at the expense of Mexico by the respective Sections of the Commission, or under their supervision, each within the territory of its own country. (b) The United States, within a period of five years from the date of the entry into force of this Treaty, shall construct in its own territory and at its expense, and thereafter operate and maintain at its expense, the Davis storage dam and reservoir, a part of the capacity of which shall be used to make possible the regulation at the boundary of the waters to be delivered to Mexico in accordance with the provisions of Article 15 of this Treaty. (c) The United States shall construct or acquire in its own territory the works that may be necessary to convey a part of the waters of the Colorado River allotted to Mexico to the Mexican diversion points on the international land boundary line referred to in this Treaty. Among these works shall be included: the canal and other works necessary to convey water from the lower end of the Pilot Knob Wasteway to the international boundary, and, should Mexico request it, a canal to connect the main diversion structure referred to in sub-paragraph (a) of this Article, if this diversion structure should be built in the limitrophe section of the river, with the Mexican system of canals at a point to be agreed upon by the Commission on the international land boundary near San Luis, Sonora. Such works shall be constructed or acquired and operated and maintained by the United States Section at the expense of Mexico. Mexico shall also pay the costs of any sites or rights of way required for such works. (d) The Commission shall construct, operate and maintain in the limitrophe section of the Colorado River, and each Section shall construct, operate and maintain in the territory of its own country on the Colorado River below Imperial Dam and on all other carrying facilities used for the delivery of water to Mexico, all 100 |