OCR Text |
Show THE PROVO RIVER PROJECT Total Cost: $ 15,524,000 AQUEDUCT Division Cost: $ 5550,000 DEER CREEK Division Cost: $ 7,600,000 40.8 miles of Aqueduct to S. L Valley 3 miles Alpine * Dr. Tunnel Rights of Way .7 mile Olmsted Tunnel 37.1 miles of covered pipe " line UTAH LAKE DIKE Division Cost: $ 2,374,000 Goshen Bay Dike Section $ 1,954,000 Examinations and Surveys $ 45,000 Jordan River Channel Unit $ 375.000 Examinations. Surveys and Preconstruct- icn:$ 185,000 Canal System $ 3.515.000 Deer Creek Dam $ 2,650,000 Highway Relocation $ 100,000 Railroad Relocation $ 600,000 Rights of Way $ 550,000 Duchesne Tun n el $ 2.107.000 Weber Provo Canal $ 500,000 Provo Res. Canal $ 908,000 CONSTRUCTION UNITS of the PROVO RIVER PROJECT METROPOLITAN WATER DISTRICT OF SALT LAKE CITY Jan. I. 1942 H. C. G. |