Title |
Fifteenth Annual report of the Upper Colorado River Commission |
Creator |
Upper Colorado River Commission |
Subject |
Water resources development; Watershed management |
Spatial Coverage |
Colorado River (Colo.-Mexico); Colorado River (Wyo.-Utah) |
OCR Text |
Show The Annual Report of the Upper Colorado River Commission consists of the estimated budget for the commission and a report of annual activities. The budget of the Commission is found in Appendix B. |
Publisher |
Salt Lake City; Ut; Upper Colorado River Commission |
Contributors |
Goslin, Ivan V |
Date |
1963-09-30 |
Type |
Text |
Format |
application/pdf |
Digitization Specifications |
Pages were scanned at 400 ppi on Fujitsu fi-5650C sheetfed scanner as 8-bit grayscale or 24-bit RGB uncompressed TIFF images. For ContentDM access the images were resampled to 750 pixels wide and 120 dpi and saved as JPEG (level 8) in PhotoShop CS with Unsharp Mask of 100/.3. Foldout pages larger than 11" x 14" were captured using a BetterLight Super 8K-2 digital camera back on a 4x5 view camera (100mm Schneider APO lens). Oversize images were resampled to 1500 pixels wide. Optical Character Recognition (OCR) by ABBYY FineReader 7.0 with manual review. |
Resource Identifier |
http://content.lib.utah.edu/cgi-bin/docviewer.exe?CISOROOT=/wwdl-doc&CISOPTR=8234 |
Source |
Bureau of Economic & Business Research ; University of Utah |
Language |
eng |
Relation |
Western Waters Digitial Library |
Coverage |
1962-1963 |
Rights Management |
Digital Image Copyright 2005, Marriott Library, University of Utah. All Rights Reserved. |
Contributing Institution |
J. Willard Marriott Library, University of Utah, 295 S 1500 E, Salt Lake City, UT 84112-0860 |
Source Physical Dimensions |
v. ill.,maps 23 cm |
Scanning Technician |
Seung Hoon Yoo |
Call Number |
LC: HD1695.C7 |
ARK |
ark:/87278/s680520q |
Setname |
wwdl_documents |
ID |
1138121 |
Reference URL |
https://collections.lib.utah.edu/ark:/87278/s680520q |
Title |
page 069 |
OCR Text |
Show g. Battlement Mesa Project Plan formulation, water supply, and land classification studies are in progress. h. Bluestone Project Engineering surveys and plan formulation studies are in progress. i. Grand Mesa Project Feasibility investigations are continuing. Engineering surveys and cooperative work with Federal agencies are in progress. UTAH a. Uintah Unit, Central Utah Project (Ultimate) Feasibility investigations were initiated. Drainage investigations, land classification studies, and preliminary cost estimates for plan formulation are in progress. 3. UNDER RECONNAISSANCE INVESTIGATIONS COLORADO a. Juniper Project A reconnaissance report on the Juniper Project was completed in July 1963 and has been distributed to interested agencies. Conclusions in the report are that an initial development involving about 9,000 acres of land and a powerplant of 30,000-kilowatt installed capacity would warrant a feasibility investigation. The possibility of developing a larger project involving 100,000 acres also would be studied as part of the feasibility investigation. b. Ruedi Western Slope Project A reconnaissance report on the Ruedi Western Slope Investigations was completed in January 1963. The report has been distributed to interested State and Federal agencies. As an extension of the investigations, a special study is nearing completion to determine the proper diversion elevation at Ruedi Reservoir for delivery of water to the potential Basalt Project. This determination is necessary before final construction plans are prepared for the Ruedi Dam and outlet works. 69 |
Format |
application/pdf |
Resource Identifier |
071-UUM-UpperColoRiverComm15th_page 069.jpg |
Source |
Original Book: Annual report of the Upper Colorado River Commission: 15th |
Setname |
wwdl_documents |
ID |
1138080 |
Reference URL |
https://collections.lib.utah.edu/ark:/87278/s680520q/1138080 |