Show rado, California, Nevada, and Wyoming, and from all interested Federal agencies. New Mexico was granted an extension of time for submitting its comments. b. Dallas Creek Feasibility investigations are progressing essentially as scheduled. Preparation of design data on all project features is in progress. Writing of the proposed land and agricultural economics and water supply appendices is in progress. Cooperative studies by other Federal agencies are continuing. Completion of a proposed feasibility report is scheduled late in fiscal year 1964. c. Dolores Project The project feasibility report on the Dolores Project was submitted to the Commissioner of Reclamation on May 31, 1963, for further action at the Washington level. Minor revisions are being made following the Washington office review. d. San Miguel Project Feasibility investigations on the San Miguel Project are progressing as scheduled. Feasibility designs and estimates have been completed for Telluride Dam, Naturita Dam, Pitchfork Dam, Norwood Canal, and Mailbox Park Canal. Work on the project land and agricultural economic appendices is in progress. Cooperative studies by Federal agencies are continuing. A proposed feasibility report is scheduled for completion at the end of fiscal year 1964. e. West Divide Project Good progress is being made on the West Divide Project feasibility investigations. Preparation of design data for all project features has been undertaken. A proposed feasibility report is scheduled to be completed in 1964. f. Yellow Jacket Project The Yellow Jacket Project is located in Moffat and Rio Blanco Counties, Colorado, and in the White and Yampa River Basins. Land classification studies, water supply studies, and plan formulation studies are in progress. A cooperative program of the Bureau of Reclamation with the State of Colorado and the Geological Survey to obtain aerial maps of the project area has been largely completed. 68 |