51 - 75 of 59
Number of results to display per page
TitleDateType
51 Salt Creek flooding : Looking up stream across Salt Creek upper barrier after it had been in operation two years [and] Spillway through above barrier1932Image/StillImage
52 Salt Creek flooding : Lower barrier on Salt Creek above Nephi at the beginning of the third season of operation [and] Salt Creek out of bounds at Plaster Mill above Nephi, on the evening of Aug. 13, 19231923; 1932Image/StillImage
53 Shoal Creek Dam : Equalizing reservoir no. 1 on Shoal Creek [and] Equalizing reservoir no. 2 on Shoal Creek1930; 1931; 1932Image/StillImage
54 Shoal Creek Dam : Excavation for Shoal Creek diversion dam above Enterprise [and] The same after dam was finally completed1930; 1931; 1932Image/StillImage
55 Shoal Creek Dam : Looking up stream through spillway of Shoal Creek diversion dam [and] The same looking down stream1930; 1931; 1932Image/StillImage
56 Spillway on Payson Creek : Constructing the main barrier and spillway in Pigeon Creek, rocks dragged into place by teams are grouted with concrete to hold them in position [and] A secondary spillway on Payson Creek made of timber1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933Image/StillImage
57 Summit Flood Control Dam : Constructing flood control diversion dam at Summit [and] The same after completion and after a terrific summer flood carrying boulders weighing tons each1930; 1931; 1932Image/StillImage
58 Woodruff Reservoir spring of 1930 during the time of heaviest spring floods [and] Woodruff spillway 19301930Image/StillImage
59 Woodruff spillway : Woodruff equalizing reservoir, showing first construction camp, 1926, and beginning of the new dam [and] Woodruff spillway at the height of 24 ft., which was the first level reached1926Image/StillImage
51 - 75 of 59