| OCR Text |
Show 118 establishing and operating these Regional projects projects. operation today are with a butter and a bog and chicken projeot, ani a milk pea Vinery, a all ..purpos£;e far an .... in dat,ry plant, eanning and drying plant.19 'Whether tho oX" not there is a r gional project, ths stakes ards in 1e region still have their indildual projects. stak& is reqUired to contibute ita ahare of nash or labor and/or E oh to the SUpport of the regional projeot. Finapeing he Projeots Rasponsibilitl local Church unit. lunda Olten, are usually however J a tor IPast raised financing production projects offerings through are not to be used permanent project. projeet Often the are for this purpose. the cash co ntributions of ward members. supplem.entary product! on project he pr oceeda Qf that rests with the sold. and. is established and the cash u.sed to "supplementaryfl project acquire tbe becomes the permanent project itself. Obligations for the ann:u.al budget pened while peranent production projeots must still be a double one met, whether in cash. for a time jI double burden is not only 19. Ibid. - in. 1dnd but ward members Q replace the post They Tnt burden thus beoomes removed, is cannot be being atab11Bhed. project of m.aterials and Labor contrib tions are Onee the annual bUdget aSsignment with cover the cost or aesignment )aid for" however, the can tl'lcn meet their miniml.l:ln eash contrt l)ut1 on--enough to supplies used in major portion prooueing of the the budget. cash cont i'utions. |