| OCR Text |
Show 109 Part purposes. the into be provo by tapped by Wasatch the thrown Range. across Downstream, said he to would employ thousands; it valuable most chronically faced with to the worst degree spite Blood could not could be be found let to the of the a spade and all take uncertain water agree As an anti- it 50 would and need earth of the be benefits, contracts had made to get was a different to vail- fairly easy, but getting was was drouth.23 subscribers that would but exempli as Before turned, water new Utah's to manifest the of cent per supply project underway. how much each on project prostrating 1934 the by obvious get no lands--already cultivated farm Finding participants able. to an be is provide irrigation water would potentially Creek. inhabited by area an to was there it to through deep-water bay. a than Deer the In mammoth dike state water population; Duchesne would the measure, flow tunnel driven "convinced that was supply culinary fied a to made the and canal, a part of Utah Lake to create importa.nt" depression of means five-and-one-half mile a Blood more the Weber River would be of them propo- sition. Early city, county, work out a in and canal governor company fa.ir division. 23GC 1934, 1934. the January, The FER! file, began meeting with representatives meetings Blood to to help them continued with Ickes, October 18, 19, |