| OCR Text |
Show 21. Thus 2 to the 310 fo the r 810 Pb, zinc Fe) co n ce 3910 .510 Z'ino, Cu, 13 ing: Ag, 0 zs returns smelter the would be following nt rates assay 20-25t assuming s. normal prices, Charges Payment Z'ino--- $36.20 Silver- 6.79 Smelting $15.00 Net $'42 .99 from sa.18:;of 6.80 Freight ets·-. 1 ton of .50 Saapling to Hauling RR .50 $22.8Q COSTS: Power Rent Three - $2.00 of r per ground men Repairs, pe day, on operating mill hea t Average output these t ton of @ per month $3.50 extras Lng l:ld cost lead-iron per zinc day per .:.?.lL '14.66 day is 1 ton of zino concentrates concentrates. From the concentrates concentrates (t ton) (1 ton) -- ------ sale of Profit investment represents of $8,000. $4,536, or If $ .59 20.l9 -29 .78 Total cost per day this 10.50 -- Total an 1.66 ----- concentrates, lead-iron on 2.00 --------------- the mill of -----$ M.P. MOTor $50 Creek Total and about 7- day for the 56.610 of --_!!!. ---------------$15.12 mill works 300 the money days invested. a year |