Gas Compression Plant at Redwash

Update Item Information
Title Gas Compression Plant at Redwash
Identifier ucl_1772-1
Subject Industry--Oil Drilling--Gas Compression--Redwash, Utah
Description The compressor plant at Red Wash oil field was completed in March of 1959. This pland compresses natural gas from the field from 100 lbs. to 3500 lbs. in three stages and injects the gas into four wells. This plant will inject 16 million cubic feet of gas per day and in the process will consume 1 million cubic feet. Four 1000 b.p. engines are used in the plant.
Date 1959-05
Type Image/StillImage
Format image/jpeg
Language eng
Rights Management Digital Image, copyright 2017 Uintah County Regional History Center
Bit Depth 8
Scanning Technician Aric Hansen
Scanning Device Creo-Scites Jazz+flatbed scanner
Spatial Coverage Vernal (Utah)
ARK ark:/87278/s6ck22zx
Setname ucl_rhc
ID 1211567
Reference URL https://collections.lib.utah.edu/ark:/87278/s6ck22zx
Back to Search Results