Title |
Gas Compression Plant at Redwash |
Identifier |
ucl_1772-1 |
Subject |
Industry--Oil Drilling--Gas Compression--Redwash, Utah |
Description |
The compressor plant at Red Wash oil field was completed in March of 1959. This pland compresses natural gas from the field from 100 lbs. to 3500 lbs. in three stages and injects the gas into four wells. This plant will inject 16 million cubic feet of gas per day and in the process will consume 1 million cubic feet. Four 1000 b.p. engines are used in the plant. |
Date |
1959-05 |
Type |
Image/StillImage |
Format |
image/jpeg |
Language |
eng |
Rights Management |
Digital Image, copyright 2017 Uintah County Regional History Center |
Bit Depth |
8 |
Scanning Technician |
Aric Hansen |
Scanning Device |
Creo-Scites Jazz+flatbed scanner |
Spatial Coverage |
Vernal (Utah) |
ARK |
ark:/87278/s6ck22zx |
Setname |
ucl_rhc |
ID |
1211567 |
Reference URL |
https://collections.lib.utah.edu/ark:/87278/s6ck22zx |