Title |
The Eighth Annual report of the Upper Colorado River Comission to the Presidentof the United States and the Governors of the Upper Colorado River Basin States |
Creator |
Upper Colorado River Commission |
Subject |
Water resources development; Watershed management |
Spatial Coverage |
Colorado River (Colo.-Mexico); Colorado River (Wyo.-Utah) |
OCR Text |
Show The Annual Report of the Upper Colorado River Commission consists of the estimated budget for the commission and a report of annual activities. Budget of the Commission in attached in Appendix A. |
Publisher |
Salt Lake City; Ut; Upper Colorado River Commission |
Contributors |
Goslin, Ivan V. |
Date |
1957-03-10 |
Type |
Text |
Format |
application/pdf |
Digitization Specifications |
Pages were scanned at 400 ppi on Fujitsu fi-5650C sheetfed scanner as 8-bit grayscale or 24-bit RGB uncompressed TIFF images. For ContentDM access the images were resampled to 750 pixels wide and 120 dpi and saved as JPEG (level 8) in PhotoShop CS with Unsharp Mask of 100/.3. Foldout pages larger than 11" x 14" were captured using a BetterLight Super 8K-2 digital camera back on a 4x5 view camera (100mm Schneider APO lens). Oversize images were resampled to 1500 pixels wide. Optical Character Recognition (OCR) by ABBYY FineReader 7.0 with manual review. |
Resource Identifier |
http://content.lib.utah.edu/cgi-bin/docviewer.exe?CISOROOT=/wwdl-doc&CISOPTR=7424 |
Source |
Bureau of Economic & Business Research, School of Business, University of Utah |
Language |
eng |
Relation |
Western Waters Digitial Library |
Coverage |
1956-1957 |
Rights Management |
Digital Image Copyright 2005, Marriott Library, University of Utah. All Rights Reserved. |
Contributing Institution |
J.Willard Marriott Library, University of Utah, 295 S 1500 E, Salt Lake City, UT 84112-0860 |
Source Physical Dimensions |
v. ill.,maps 23 cm |
Scanning Technician |
Seung Hoon Yoo |
Call Number |
LC: HD1695.C7 |
ARK |
ark:/87278/s61j993t |
Setname |
wwdl_documents |
ID |
1137312 |
Reference URL |
https://collections.lib.utah.edu/ark:/87278/s61j993t |
Title |
page-056 |
OCR Text |
Show WYOMING a. Savery-Pot Hook Project This project is situated in both Colorado and Wyoming. For informaion concerning it, see g. under Projects Being Investigated For Feasibility Reports - COLORADO. 3. Participating Projects In Reconnaissance Stage Of Investigations Detailed investigations have been undertaken by the Bureau of Reclamation only on the priority projects mentioned above. Investigations of the following projects are in the reconnaissance stage. For some of them, work toward a feasibility report must await the accumulation of the necessary steam-gaging records, or the providing of adequate funds and personnel. COLORADO a. Parshall Project The Ute Park Dam will be constructed on the Williams River above its junction with Keyser Creek. A structure 191 feet above streambed would create a reservoir with a capacity of 43,000 acre-feet. The Skylark Canal would extend 45 miles from the reservoir outlet, serving lands on the west side of the Williams River Valley, and the east side of the lower Blue River Valley. The Sylvan Canal would also head at the reservoir outlet and would continue northward 17 miles serving lands on the east side of Williams River Valley and in Little Muddy Creek Valley. The existing Big Lake Ditch would be enlarged and extended. The project would provide water to 24,410 acres of new land and supplemental water to 3,100 acres presently irrigated. The proposed development for the Parshall Project is in competition with the City .and County of Denver's plan to enlarge Williams Fork Reservoir for replacement storage and power purposes. -56- |
Format |
application/pdf |
Resource Identifier |
078-UUM-UpperColoRiverComm8th_page-056.jpg |
Source |
Original Book: Annual report of the Upper Colorado River Commission: 8th |
Setname |
wwdl_documents |
ID |
1137262 |
Reference URL |
https://collections.lib.utah.edu/ark:/87278/s61j993t/1137262 |