OCR Text |
Show Appendix C (Cont'd) COLORADO RIVER STORAGE PROJECT Construction Contracts Scheduled for Bidding February - April 1957 GLEN CANYON UNIT 1. Dam, tunnel, and powerplant - Constructing Glen Canyon Dam, Tunnel, and Powerplant. 2. Water Tanks, Glen Canyon Community Facilities - Furnishing and erecting one 150,000-gallon elevated steel water tank with minimum water surface 65 feet above footings and one 3,000,000-gallon standard steel reservoir. 3. Residence foundations - Grading sites and constructing foundations for 50 portable houses. 4. Gas Distribution System, Glen Canyon Community Area - Constructing a liquified petroleum gas distribution system with buried pipe and branch shut-offs, with piping being buried in the same trenches as the water supply lines. 5. Sewage Treatment Plant, Glen Canyon Community - Constructing a sewage treatment plant, including a comminutor, a 30-foot-diameter clarifier, a 35-foot-diameter digester, and a control building for gas and steam equipment, and stabilization ponds. 6. Highway Surfacing - Constructing base course and bituminous surfacing for 25 miles of access highway from Bitter Springs to Glen Canyon Dam Site. 7. Community Facilities - Constructing about 290 residences and facilities for a 2,000-person community at Glen Canyon. Work will include streets, water and sewer main. -85- |