Title |
Dowd Mountain Road |
Identifier |
VE2828 |
Subject |
Roads; Dowd Mountain; Road Construction |
Spatial Coverage |
Vernal (Utah) |
Description |
The Dowd Mountain cutoff road is under construction at Spring Canyon. The contractor has constructed a preliminary road so that rock work on the dugway may be continued through winter months. The top arrow show the old Switch-back road. the lower arrows point tot he new preliminary road which is now being widened and improved with cuts and fills. |
Donor |
Vernal Express |
Source Collection |
Vernal Express |
Publisher Digital |
Uintah County Regional History Center |
Date |
1968-09-19 |
Type |
Image/StillImage |
Format |
image/jpeg |
Language |
eng |
Rights |
Digital Image, Copyright 2021 Uintah County Regional History Center |
Archival Resolution |
600 dpi, 4542 x 3021 pixels |
Low Resolution |
800 x 600 pixels |
Bit Depth |
8 |
Scanning Device |
Epson Perfection V800 |
Scanning Technician |
Elaine Carr |
ARK |
ark:/87278/s6xm46gc |
Setname |
ucl_vep |
ID |
1636701 |
Reference URL |
https://collections.lib.utah.edu/ark:/87278/s6xm46gc |