Ames power plant, San Miguel County, Colorado [062]: Flume

Request Archival File or Update Item Information
Title Ames power plant, San Miguel County, Colorado [062]: Flume
Photo Number P0206add2n01_09_051
Description Scan of a photo of a man holding a piece of rebar on a wooden platform with a dog.
Date 1954-05-01
Textual Date May 1, 1954
Keywords Rocky Mountain Power; Ames; Colorado; Personnel
Subject Flumes--Colorado--San Miguel County--Photographs; Water-power--Colorado--San Miguel County--Photographs
Spatial Coverage Ames (Colo.); San Miguel County (Colo.)
Latitude 37.864583
Longitude -107.881692
Additional Information The Ames hydroelectric generating plant had its beginnings when L.L. Nunn installed a Westinghouse electric generator and motor in the winter of 1890-91 on the South Fork of the San Miguel River to provide electricity to the Gold King Mine stamp mill, located 2.6 miles away. This was the first commercial power system to use alternating current. A powerhouse was built in 1895 by Nunn's Telluride Power Company, to be replaced by a new plant in 1905-06. Flumes, and later penstocks (steel pipes), brought water from Trout Lake and Lake Hope, located to the south up Lake Fork. Howards Fork, to the east, supplied additional water. Telluride Power later became part of Western Colorado Power Company, a subsidiary of Utah Power & Light (predecessor of Rocky Mountain Power). The hydroelectric plant, still in operation today, has been owned by Public Service Company, a subsidiary of Xcel Energy, since 1992.
Collection Number and Name P0206 Rocky Mountain Power Company Photograph Collection
Collection Name Rocky Mountain Power Company
Rights
Type Image
Finding Aid https://archiveswest.orbiscascade.org/ark:80444/xv479461
Digitization Specifications Digital image produced on Epson Expression 10000 XL scanner, RGB, at 400 dpi. Archival file is uncompressed TIFF.
ARK ark:/87278/s6xk967s
Setname uum_map
ID 985380
Reference URL https://collections.lib.utah.edu/ark:/87278/s6xk967s