Steinaker Dam Construction

Update Item Information
Title Steinaker Dam Construction
Identifier P325-418-0430
Subject Dam--Steinaker Dam--Construction; Central Utah Water Project
Description View of concrete sheet pile driving force consists of a 2500 lb. driving head dropping from 3 to 4 feet. Penetration of pile per blow varies, at this time it was about 1-inch. Work is bing done at drop structure at station 107+60 by L. C. Stevenson and Grant Hansen, contractor under specification DC-5317.
Publisher Uintah County Regional History Center
Type Image/StillImage
Format image/jpeg
Language eng
Rights Management Digital Image, Copyright 2018 Uintah County Regional History Center
Holding Institution Bureau of Reclamation
Bit Depth 8
Archival Resolution 5421 x 4295 pixels, 1200 dpi,
Scanning Technician Elaine Carr
Scanning Device Epson Perfection 4870 Photo Scanner
Spatial Coverage Vernal (Utah)
ARK ark:/87278/s6tt9102
Setname ucl_rhc
ID 1378939
Reference URL https://collections.lib.utah.edu/ark:/87278/s6tt9102