Steinaker Dam Construction

Update Item Information
Title Steinaker Dam Construction
Identifier P325-418-1473
Subject Steinaker Dam--Central Utah Water Project; Construction; Vernal, Utah
Description Block 1 - Looking north from station 41+75 along the centerline of 21-B-1 drain to station 43+00. Stable soil conditions permitted a narrow trench in this area and progress was speeded up. This photo also shows the uniform 4-inch gravel envelope which has been depositied by the shield.
Publisher Uintah County Regional History Center
Contributors By permission of the Bureau of Reclamation of the United States Government
Date 1970-08-24
Type Image/StillImage
Format image/jpeg
Language eng
Rights Management Digital Image, Copyright 2019 Uintah County Regional History Center
Holding Institution Uintah County Regional History Center
Bit Depth 16
Archival Resolution 979 x 970 pixels 300 dpi,
Scanning Technician Linda S. Wilson
Scanning Device Epson Perfection V800 Photo Scanner
Spatial Coverage Vernal (Utah)
Source Material Bureau of Reclamation
ARK ark:/87278/s65q98ts
Setname ucl_rhc
ID 1407625
Reference URL https://collections.lib.utah.edu/ark:/87278/s65q98ts