|
|
Title | Creator | Description | Date |
101 |
|
Quantifying Electricity-Related Emissions for On-Campus Buildings | Savas, Alexia | This UROP funded project looked to quantify indirect emissions for on-campus buildings using the Skyspark database and EPA calculated emission factors. This poster was presented at the 2019 Spring Undergraduate Research Symposium. | 2019 |
102 |
|
Pollinator Garden, University of Utah Construction Document Set | G. Brown Design Inc. | | 2019 |
103 |
|
Bonderman Field Station at Rio Mesa 2019 Bird Banding Report | | The primary purpose of our project is to understand the ecology and migratory patterns of the bird community at the Bonderman Field Station at Rio Mesa using mist-netting and bird banding. | 2019 |
104 |
|
Pioneer Garden 2040 Master Plan | Edible Campus Gardens | The purpose of this document is to provide the University of Utah's Office of Sustainability; with a comprehensive 21-year vision for the future space of the Pioneer Garden. It will; serve as an implementation timeline to aid in the continued development of the Edible; Campus Gardens. | 2019 |
105 |
|
Making the Transition to Sustainable Operations at the University of Utah: A Framework for Closing the Performance Gap | Ashurt, Joseph | Identify existing gaps | 2019 |
106 |
|
Resolution to Reaffirm a Commitment to Achieving Net-Zero Carbon Emissions | ASUU; University of Utah Sustainability Office; Facilities Sustainability and Energy Team | Date of document is April 2019 For SustainabilityU archive This resolution was adopted by the U of U academic senate https://academic-senate.utah.edu/meetings/april-1-2019/ The Sustainability Office would like to have an archived copy in order to link to a website that documents a history of U of U ... | 2019 |
107 |
|
Sustainability Office Equity Review | University of Utah Sustainability Office | Sustainability office equity commitments | 2020 |
108 |
|
Title V Operating Permit | State of Utah, Department of Environmental Quality | Emissions from the University of Utah are primarily due to the operation of: boilers, comfort heating equipment, and emergency generators. Boilers located throughout the campus are covered by "Standards of Performance for Small Industrial-Commercial-Institutional Steam Generating Units" found in 40 ... | 2020 |
109 |
|
University of Utah Climate Resilience Assessment Matrix | Brunvand, Amy | | 2021 |
110 |
|
The Red Butte Canyon Ozone Network: leveraging existing infrastructure to probe background concentrations, canyon flows and stratospheric oxidant exchange | Mitchell, Logan; Bares, Ryan; Trejo, Erica | The Salt Lake Valley (SLV) experiences frequent prolonged pollution episodes impacting the health of the ~1 million residents of the valley. These health effects include an array of respiratory and pulmonary problems, chiefly among susceptible populations and those participating in outdoor activitie... | 2021 |
111 |
|
University of Utah Climate Resilience Assessment | Climate Commitment Task Force Subcommittee on Climate Resilience | | 2021 |