|
|
Title | Date | Type | Setname |
51 |
|
Parowan City flood barrier : Sand and gravel were a serious menace to Parowan City and to the irrigation system before the barrier was built in 1925 [and] Gravel deposited above the Parowan flood barrier supplies the building needs of the community | 1923; 1924; 1925 | Image/StillImage | uum_map |
52 |
|
Spillway on Payson Creek : Constructing the main barrier and spillway in Pigeon Creek, rocks dragged into place by teams are grouted with concrete to hold them in position [and] A secondary spillway on Payson Creek made of timber | 1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933 | Image/StillImage | uum_map |
53 |
|
Manti barrier at the close of the high water season [and] Manti barrier spillway in operation | 1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933 | Image/StillImage | uum_map |
54 |
|
Kessler Canyon barrier spillway : looking up stream from Garfield smelter at series of control structures in Kessler Canyon [and] Looking down stream across site of main barrier spillway, Kessler Canyon, during construction | 1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933 | Image/StillImage | uum_map |
55 |
|
Kessler Canyon barrier spillway : Lifting boulders out of the ground for use in building main spillway, Kessler Canyon [and] Boulders being placed by heavy derrick, in foundation of main spillway, Kessler Canyon | 1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933 | Image/StillImage | uum_map |
56 |
|
Kessler Canyon barrier spillway looking downstream toward Garfield smelter [and] The same after a forrential flood which reached a depth of 7 feet over the 70 foot crest | 1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933 | Image/StillImage | uum_map |
57 |
|
Kessler Canyon barrier spillway : building an equalizing check above intake to tunnel through Garfield Smelter [and] Constructing a check dam in Kessler Canyon below main structure | 1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933 | Image/StillImage | uum_map |
58 |
|
Kessler Canyon barrier spillway : looking down stream from main spillway, Kessler Canyon [and] Detail of rubble-concrete construction | 1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933 | Image/StillImage | uum_map |
59 |
|
Erosion on Santa Clara Creek is a problem of great concern to the farmers of St. George and Santa Clara | 1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933 | Image/StillImage | uum_map |
60 |
|
Erosion on Santa Clara Creek : an attempt at control on Santa Clara Creek | 1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933 | Image/StillImage | uum_map |
61 |
|
Chalk Creek before control, looking up stream during period of highwater in spring, when stream was carrying large quantities of gravel [and] Looking up stream across north end of Fillmore barrier, first season of operation | 1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933 | Image/StillImage | uum_map |
62 |
|
Kessler Canyon barrier spillway : Guniting a rubble-concrete wing wall, Kessler Canyon [and] Gasoline driven shovel building the flood barrier, Kessler Canyon | 1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933 | Image/StillImage | uum_map |
63 |
|
Kessler Canyon barrier spillway : spillway through man barrier, Kessler Canyon [and] The flood stream drops over a circular crest into a stilling pond | 1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933 | Image/StillImage | uum_map |
64 |
|
Erosion of foot hills near Bountiful, showing goat herd which grazes over the Bountiful water-shed [and] Near the crest of the Davis County water-shed where floods originate | 1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933 | Image/StillImage | uum_map |
65 |
|
Looking down Cottonwood Creek at Farmington after flood of 1922 and before barrier construction [and] Farmington spillway, first season of operation | 1922; 1924; 1925 | Image/StillImage | uum_map |
66 |
|
Haights Creek Diversion dam in process of construction | 1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933 | Image/StillImage | uum_map |
67 |
|
Farmington, August 1924, commencement of spillway and barrier | 1924 | Image/StillImage | uum_map |
68 |
|
Enterprise flood dam in process of construction | 1924; 1925; 1926 | Image/StillImage | uum_map |
69 |
|
Farmington spillway before first season of operation | 1924; 1925 | Image/StillImage | uum_map |
70 |
|
Kessler Canyon main spillway structure | 1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933 | Image/StillImage | uum_map |
71 |
|
Butcher Shop, Mine Office and Wasatch Store, Sunnyside | 1920; 1921; 1922; 1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933; 1934; 1935; 1936; 1937; 1938; 1939; 1940 | Image/StillImage | uum_map |
72 |
|
Trip assembly yard Castle Gate Number 2 Mine at Willow Creek | 1912; 1913; 1914; 1915; 1916; 1917; 1918; 1919; 1920; 1921; 1922; 1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933; 1934; 1935; 1936; 1937; 1938; 1939; 1940; 1941; 1942; 1943; 1944; 1945; 1946; 1947; 1948; 1949; 1950 | Image/StillImage | uum_map |
73 |
|
Haulage Portal Castle Gate Number 2 Mine, Bridge over Willow Creek | 1920; 1921; 1922; 1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930 | Image/StillImage | uum_map |
74 |
|
Castle Gate Tipple and townsite | 1920; 1921; 1922; 1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933; 1934; 1935; 1936; 1937; 1938; 1939; 1940 | Image/StillImage | uum_map |
75 |
|
Dip and strike of Cambrian shales, slates and quartzite, Big Cottonwood Canyon | 1910; 1911; 1912; 1913; 1914; 1915; 1916; 1917; 1918; 1919; 1920; 1921; 1922; 1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933; 1934; 1935; 1936; 1937; 1938; 1939; 1940; 1941; 1942; 1943; 1944; 1945 | Image/StillImage | uum_map |