Filters: Type: "Image"
101 - 125 of 140
Number of results to display per page
TitleDateTypeSetname
101 Malad Power Pipeline across Malad River1914-02-08Imageuum_map
102 Malad Power Station, Malad Gorge, Gooding County, Idaho1911; 1912; 1913; 1914; 1915Imageuum_map
103 Page 378, C. Total Work Completed During The PeriodImagedha_ccc
104 Steam rising from Malad River1911; 1912; 1913; 1914; 1915Imageuum_map
105 Framing Malad River intake gates1909; 1910; 1911; 1912; 1913; 1914; 1915Imageuum_map
106 Intake Malad Power flume looking down Malad River1914-02-08Imageuum_map
107 Looking down on Malad River and flume from south side of canyon1909; 1910; 1911; 1912; 1913; 1914; 1915Imageuum_map
108 Lot 1, sec. 34, T.6S., R. 13E.1911; 1912; 1913; 1914; 1915Imageuum_map
109 Malad Power Flume during construction1909; 1910; 1911; 1912; 1913; 1914; 1915Imageuum_map
110 Malad Power Flume during construction1909; 1910; 1911; 1912; 1913; 1914; 1915Imageuum_map
111 Malad Power Flume during construction1909; 1910; 1911; 1912; 1913; 1914; 1915Imageuum_map
112 Malad Power Intake flume looking up Malad River1914-02-08Imageuum_map
113 Malad Power Plant machinery came down this road. Tractor used to haul from Shoshone. Tractor near center of photo.1911; 1912; 1913; 1914; 1915Imageuum_map
114 Malad Power Station (Malad Powerhouse), view from south side of Malad River, Gooding County, Idaho1911; 1912; 1913; 1914; 1915Imageuum_map
115 Malad River development, (overflow is opposite house)1911; 1912; 1913; 1914; 1915Imageuum_map
116 Page 154, The CCC At WorkImagedha_ccc
117 Page 156, The CCC At WorkImagedha_ccc
118 Page 304, Life In The Camps-And OutImagedha_ccc
119 Page 153, The CCC At WorkImagedha_ccc
120 Page 221, Major Projects In UtahImagedha_ccc
121 Page 232, Major Projects In UtahImagedha_ccc
122 Page 379, C. Total Work Completed During The PeriodImagedha_ccc
123 Safe Opioid Prescriptive Practices: A Review of Current Literature2014-12Text; Imagewc_ir
124 Green team sponsored SCIF projects2012-06-20Text; Imageir_uspace
125 Full-scale composting financial feasibility study2011-08Text; Imageir_su
101 - 125 of 140