1 - 200 of 117
Number of results to display per page
TitleDateTypeSetname
1 [First floor plan, Nephi processing plant rough drawing]1951; 1952Image/StillImageuum_gcya
2 Addition for Nephi Processing Corp., Nephi, Utah: Main floor plan, basement plan, east elevation1951-11Image/StillImageuum_gcya
3 Addition to building for Nephi processing plant, Nephi, Utah, sheet no. 10: plumbing layout main floor plan, plumbing layout basement plan [with detail drawings]1953-03-27Image/StillImageuum_gcya
4 Addition to building for Nephi processing plant, Nephi, Utah, sheet no. 11: heating plans: basement plan, main floor plan1953-02-01Image/StillImageuum_gcya
5 Addition to building for Nephi processing plant, Nephi, Utah, sheet no. 12: basement plan [electrical, with riser diagrams, pump, machine & storage room power layout]1953-04-17Image/StillImageuum_gcya
6 Addition to building for Nephi processing plant, Nephi, Utah, sheet no. 13: first floor plan [electrical, with telephone riser diagram and cold storage rooms]1953-04-17Image/StillImageuum_gcya
7 Addition to building for Nephi processing plant, Nephi, Utah, sheet no. 1: plot plan1953-01-16Image/StillImageuum_gcya
8 Addition to building for Nephi processing plant, Nephi, Utah, sheet no. 2: footing plan and schedule1953-01-28Image/StillImageuum_gcya
9 Addition to building for Nephi processing plant, Nephi, Utah, sheet no. 3: basement plan [with room, window, and door schedules]1953-01-28Image/StillImageuum_gcya
10 Addition to building for Nephi processing plant, Nephi, Utah, sheet no. 4: first floor framing plan [with beam and slab schedules]1953-01-28Image/StillImageuum_gcya
11 Addition to building for Nephi processing plant, Nephi, Utah, sheet no. 5: Main floor plan [with glazed wall, door jamb, and window section details]1953-01-28Image/StillImageuum_gcya
12 Addition to building for Nephi processing plant, Nephi, Utah, sheet no. 6: north elevation, south elevation, east elevation, section thru outside stairs, wall, and roof covering1953-01-28Image/StillImageuum_gcya
13 Addition to building for Nephi processing plant, Nephi, Utah, sheet no. 7: cross section X - X, longitudinal section Y - Y, Stair section, section thru truss pocket1953-01-28Image/StillImageuum_gcya
14 Addition to building for Nephi processing plant, Nephi, Utah, sheet no. 8: roof framing plan [with sections]1953-01-28Image/StillImageuum_gcya
15 Addition to building for Nephi processing plant, Nephi, Utah, sheet no. 9: eviscerating room plan [with equipment schedule]1953-01-28Image/StillImageuum_gcya
16 Addition to building for Nephi processing plant, Nephi, Utah: basement plan [preliminary drawing]1953Image/StillImageuum_gcya
17 Addition to building for Nephi processing plant, Nephi, Utah: electrical layout main floor plan, electrical layout basement plan (void)1945; 1953; 1954; 1955Image/StillImageuum_gcya
18 Addition to building for Nephi processing plant, Nephi, Utah: electrical layout main floor plan, preliminary drawing1951; 1952Image/StillImageuum_gcya
19 Addition to building for Nephi processing plant, Nephi, Utah: plot plan, basement floor plan, main floor plan [preliminary drawing]1953-01-28Image/StillImageuum_gcya
20 Basement plan, scheme A [Nephi processing plant preliminary drawing]1951; 1952Image/StillImageuum_gcya
21 Basement plan, scheme B [Nephi processing plant preliminary drawing]1952-02-18Image/StillImageuum_gcya
22 Building for Nephi Processing Corp., Nephi, Utah: plot plan1945-07-10Image/StillImageuum_gcya
23 Building for Nephi Processing Corp., Nephi, Utah: sheet no. 1: Footing & foundation1945-07-19Image/StillImageuum_gcya
24 Building for Nephi Processing Corp., Nephi, Utah: sheet no. 2: Main floor plan1945-07Image/StillImageuum_gcya
25 Building for Nephi Processing Corp., Nephi, Utah: sheet no. 3: East elevation, west elevation, south elevation, north elevation1945-07Image/StillImageuum_gcya
26 Building for Nephi Processing Corp., Nephi, Utah: sheet no. 4: Cross section; details1945-07Image/StillImageuum_gcya
27 Building for Nephi Processing Corp., Nephi, Utah: sheet no. 5: drainage & sewage disposal system1945-07-21Image/StillImageuum_gcya
28 Building for Nephi Processing Corp., Nephi, Utah: sheet no. 6: electrical plan1945-08Image/StillImageuum_gcya
29 Building for Nephi Processing Corp., Nephi, Utah: sheet no. 7: heating plan1945-08Image/StillImageuum_gcya
30 Column cross section [Nephi turkey processing plant, preliminary drawing]1952-03-06Image/StillImageuum_gcya
31 Column details, Nephi processing plant, Nephi Processing Corp.: sheet no. 1 [columns]1953-03-05Image/StillImageuum_gcya
32 Cross section [Nephi turkey processing plant, preliminary drawing]1951; 1952Image/StillImageuum_gcya
33 Cross section, Nephi processing plant, rough drawing1951; 1952Image/StillImageuum_gcya
34 First floor plan, Nephi processing plant preliminary drawing1951; 1952Image/StillImageuum_gcya
35 First floor plan, Nephi processing plant preliminary drawing1951; 1952Image/StillImageuum_gcya
36 First floor plan, Nephi processing plant rough drawing1951; 1952; 1953Image/StillImageuum_gcya
37 First floor plan, Nephi processing plant rough drawing1951; 1952; 1953Image/StillImageuum_gcya
38 First floor plan, Nephi processing plant rough drawing1951; 1952Image/StillImageuum_gcya
39 First floor plan, Nephi processing plant rough drawing1951; 1952Image/StillImageuum_gcya
40 Floor plan, Nephi processing plant, rough drawing1951; 1952Image/StillImageuum_gcya
41 Floor plan, scheme A [Nephi processing plant preliminary drawing]1951; 1952Image/StillImageuum_gcya
42 Floor plan, scheme B [Nephi processing plant preliminary drawing]1952-02-18Image/StillImageuum_gcya
43 Footing & foundation plan [Nephi processing plant preliminary drawing]1945Image/StillImageuum_gcya
44 Foundation and footing plan, turkey plant1951; 1952; 1953Image/StillImageuum_gcya
45 Glazed walls [Nephi processing plant preliminary drawing]1951; 1952Image/StillImageuum_gcya
46 Jamb, mullion detail [Nephi processing plant rough drawing]1951; 1952Image/StillImageuum_gcya
47 Longitudinal section (void) [Nephi processing plant preliminary drawing]1951; 1952Image/StillImageuum_gcya
48 Nephi Processing Corporation, Nephi, Utah: Drawing no. 2278-B1952-02-19Image/StillImageuum_gcya
49 Nephi Processing Corporation, Nephi, Utah: Drawing no. 2278-C1952-02-20Image/StillImageuum_gcya
50 Nephi processing plant [preliminary floor plan]1945-07-10Image/StillImageuum_gcya
51 Nephi processing plant preliminary drawing of section detail1945; 1951; 1952; 1953Image/StillImageuum_gcya
52 Nephi processing plant preliminary drawing of section detail1945; 1951; 1952; 1953Image/StillImageuum_gcya
53 Nephi processing plant preliminary drawing, first and second floors, rough drawings1951; 1952Image/StillImageuum_gcya
54 Nephi processing plant preliminary drawing, Section Y - Y' [void]1951; 1952Image/StillImageuum_gcya
55 Nephi processing plant rough drawing of elevations1951; 1952Image/StillImageuum_gcya
56 Nephi processing plant rough section drawing1951; 1952Image/StillImageuum_gcya
57 Nephi processing plant rough section drawing1951; 1952Image/StillImageuum_gcya
58 Nephi processing plant, boiler plant & heating specifications1945-08-15Image/StillImageuum_gcya
59 Nephi processing plant, inc. box conveying system: Section conveyor system1953-02-27Image/StillImageuum_gcya
60 Nephi turkey processing plant roof framing plan, preliminary drawing1953Image/StillImageuum_gcya
61 Nephi turkey processing plant, incomplete preliminary drawing1945; 1951; 1952; 1953Image/StillImageuum_gcya
62 Nephi turkey processing plant, preliminary cross sections, building and chill room1945Image/StillImageuum_gcya
63 Nephi turkey processing plant, preliminary drawing of box storage area1945; 1951; 1952; 1953Image/StillImageuum_gcya
64 Nephi turkey processing plant, preliminary drawing of longitudinal cross section1951; 1952Image/StillImageuum_gcya
65 Nephi turkey processing plant, preliminary floor plan for additions1951; 1952Image/StillImageuum_gcya
66 Nephi turkey processing plant, preliminary floor plan for additions1951; 1952Image/StillImageuum_gcya
67 Nephi turkey processing plant, revised distribution panel: riser diagram, 3-phase, 240 volt service schematic1953-05-18Image/StillImageuum_gcya
68 Nephi turkey processing plant, rough drawing of Men's and Ladies' rooms1945; 1951; 1952; 1953Image/StillImageuum_gcya
69 Nephi turkey processing plant, rough drawing with figures1945; 1951; 1952; 1953Image/StillImageuum_gcya
70 Nephi turkey processing plant, rough drawing with figures1945; 1951; 1952; 1953Image/StillImageuum_gcya
71 Nephi turkey processing plant, rough drawing with figures1945; 1951; 1952; 1953Image/StillImageuum_gcya
72 Nephi turkey processing plant, rough drawing, possibly from roof framing plan1951; 1952Image/StillImageuum_gcya
73 Nephi turkey processing plant, rough floor plan for basement1951; 1952Image/StillImageuum_gcya
74 Nephi turkey processing plant, rough floor plan for offices1951; 1952Image/StillImageuum_gcya
75 Nephi turkey processing plant, rough floor plan for offices1951; 1952Image/StillImageuum_gcya
76 Nephi turkey processing plant, rough floor plan for offices1951; 1952; 1953Image/StillImageuum_gcya
77 Office & lunch rm control [Nephi turkey processing plant]1951; 1952; 1953Image/StillImageuum_gcya
78 Pallett layout [Nephi processing plant preliminary drawing]1945; 1951; 1952; 1953Image/StillImageuum_gcya
79 Pioneer interview, Alice L. (Richardson) Gilson1938-10-07Textdha_wpabs
80 Plan, truck loading platform, Nephi processing plant [rough drawing]1945-07-05Image/StillImageuum_gcya
81 Proposed addition, Nephi Processing Corp., Nephi, Utah: [sheet] 1, basement floor1951-12-10Image/StillImageuum_gcya
82 Proposed addition, Nephi Processing Corp., Nephi, Utah: [sheet] 1, basement floor [preliminary drawing]1951-12-10Image/StillImageuum_gcya
83 Proposed addition, Nephi Processing Corp., Nephi, Utah: [sheet] 2, main floor1951-12-10Image/StillImageuum_gcya
84 Proposed addition, Nephi Processing Corp., Nephi, Utah: [sheet] 3, cross section, east elevation1951-12-10Image/StillImageuum_gcya
85 Remodeling & addition for Nephi Processing Corp., Nephi, Utah: basement floor plan1951-01-15Image/StillImageuum_gcya
86 Remodeling & addition for Nephi Processing Corp., Nephi, Utah: main floor plan1951-01-15Image/StillImageuum_gcya
87 Remodeling & addition for Nephi Processing Corp., Nephi, Utah: west elevation, north elevation, Section A-A', Section B - B'1951Image/StillImageuum_gcya
88 Rough drawing of evisceration room, Nephi turkey processing plant1945; 1951; 1952; 1953Image/StillImageuum_gcya
89 Rough drawing of evisceration room, Nephi turkey processing plant1945; 1951; 1952; 1953Image/StillImageuum_gcya
90 Schedule of bar types1951; 1952; 1953Image/StillImageuum_gcya
91 Schematic, building for Nephi Processing Corp., Nephi, Utah: south elevation, east elevation1945-07-10Image/StillImageuum_gcya
92 Scheme #1, Nephi processing plant, preliminary drawing]1951-02-12Image/StillImageuum_gcya
93 Scheme #2, Nephi processing plant,1951-02-12Image/StillImageuum_gcya
94 Scheme 1, Scheme 2 [Nephi processing plant lunch room preliminary plans]1951; 1952Image/StillImageuum_gcya
95 Second floor plan [Nephi processing plant preliminary drawing]1951; 1952Image/StillImageuum_gcya
96 Section at deep freeze [Nephi turkey processing plant]1952-03-04Image/StillImageuum_gcya
97 Section at eviserating rm [Nephi processing plant preliminary drawing]1952-03-04Image/StillImageuum_gcya
98 Section at office [Nephi processing plant rough drawing]1952-03-04Image/StillImageuum_gcya
99 Section at storge rm [Nephi processing plant preliminary drawing]1952-03-04Image/StillImageuum_gcya
100 Section thru Clerestory office & eviscerating rm [Nephi processing plant preliminary drawing]1945; 1951; 1952; 1953Image/StillImageuum_gcya
101 Section thru entrance [Nephi processing plant preliminary drawing]1951-02-19Image/StillImageuum_gcya
102 Section thru exterior stairs to basement storage rm [Nephi processing plant preliminary drawing]1951; 1952Image/StillImageuum_gcya
103 Section X - X' [Nephi processing plant preliminary drawing]1952-03-06Image/StillImageuum_gcya
104 Section Y - Y (void) [Nephi processing plant preliminary drawing]1951; 1952Image/StillImageuum_gcya
105 Section Y - Y' [Nephi processing plant preliminary drawing]1952-03-06Image/StillImageuum_gcya
106 Sheet #5 [Nephi turkey processing plant, preliminary floor plan]1945; 1951; 1952; 1953Image/StillImageuum_gcya
107 Stairwell section, Nephi processing plant preliminary drawing1945; 1951; 1952; 1953Image/StillImageuum_gcya
108 Stoker and boiler diagrams, preliminary drawings, Nephi turkey processing plant1951; 1952; 1953Image/StillImageuum_gcya
109 Trusses for future addition [Nephi turkey processing plant]1951; 1952; 1953Image/StillImageuum_gcya
110 Turkey plant, beam & joist schedule1951; 1952; 1953Image/StillImageuum_gcya
111 Turkey processing plant: first floor framing plan1952-04-17Image/StillImageuum_gcya
112 Turkey processing plant: footing schedule1951; 1952; 1953Image/StillImageuum_gcya
113 Unit heater piping [preliminary drawing, Nephi turkey processing plant]1945Image/StillImageuum_gcya
114 Wall section eviscerating rm & quick freeze [Nephi processing plant preliminary drawing]1951; 1952Image/StillImageuum_gcya
115 Wall section freeze & storage rm [Nephi processing plant preliminary drawing]1951; 1952Image/StillImageuum_gcya
116 Wall section office area [Nephi processing plant preliminary drawing]1945; 1951; 1952; 1953Image/StillImageuum_gcya
117 Wall section, Nephi processing plant preliminary drawing1951; 1952Image/StillImageuum_gcya
1 - 200 of 117