|
|
Title | Date | Type | Setname |
1 |
| [First floor plan, Nephi processing plant rough drawing] | 1951; 1952 | Image/StillImage | uum_gcya |
2 |
| Addition for Nephi Processing Corp., Nephi, Utah: Main floor plan, basement plan, east elevation | 1951-11 | Image/StillImage | uum_gcya |
3 |
| Addition to building for Nephi processing plant, Nephi, Utah, sheet no. 10: plumbing layout main floor plan, plumbing layout basement plan [with detail drawings] | 1953-03-27 | Image/StillImage | uum_gcya |
4 |
| Addition to building for Nephi processing plant, Nephi, Utah, sheet no. 11: heating plans: basement plan, main floor plan | 1953-02-01 | Image/StillImage | uum_gcya |
5 |
| Addition to building for Nephi processing plant, Nephi, Utah, sheet no. 12: basement plan [electrical, with riser diagrams, pump, machine & storage room power layout] | 1953-04-17 | Image/StillImage | uum_gcya |
6 |
| Addition to building for Nephi processing plant, Nephi, Utah, sheet no. 13: first floor plan [electrical, with telephone riser diagram and cold storage rooms] | 1953-04-17 | Image/StillImage | uum_gcya |
7 |
| Addition to building for Nephi processing plant, Nephi, Utah, sheet no. 1: plot plan | 1953-01-16 | Image/StillImage | uum_gcya |
8 |
| Addition to building for Nephi processing plant, Nephi, Utah, sheet no. 2: footing plan and schedule | 1953-01-28 | Image/StillImage | uum_gcya |
9 |
| Addition to building for Nephi processing plant, Nephi, Utah, sheet no. 3: basement plan [with room, window, and door schedules] | 1953-01-28 | Image/StillImage | uum_gcya |
10 |
| Addition to building for Nephi processing plant, Nephi, Utah, sheet no. 4: first floor framing plan [with beam and slab schedules] | 1953-01-28 | Image/StillImage | uum_gcya |
11 |
| Addition to building for Nephi processing plant, Nephi, Utah, sheet no. 5: Main floor plan [with glazed wall, door jamb, and window section details] | 1953-01-28 | Image/StillImage | uum_gcya |
12 |
| Addition to building for Nephi processing plant, Nephi, Utah, sheet no. 6: north elevation, south elevation, east elevation, section thru outside stairs, wall, and roof covering | 1953-01-28 | Image/StillImage | uum_gcya |
13 |
| Addition to building for Nephi processing plant, Nephi, Utah, sheet no. 7: cross section X - X, longitudinal section Y - Y, Stair section, section thru truss pocket | 1953-01-28 | Image/StillImage | uum_gcya |
14 |
| Addition to building for Nephi processing plant, Nephi, Utah, sheet no. 8: roof framing plan [with sections] | 1953-01-28 | Image/StillImage | uum_gcya |
15 |
| Addition to building for Nephi processing plant, Nephi, Utah, sheet no. 9: eviscerating room plan [with equipment schedule] | 1953-01-28 | Image/StillImage | uum_gcya |
16 |
| Addition to building for Nephi processing plant, Nephi, Utah: basement plan [preliminary drawing] | 1953 | Image/StillImage | uum_gcya |
17 |
| Addition to building for Nephi processing plant, Nephi, Utah: electrical layout main floor plan, electrical layout basement plan (void) | 1945; 1953; 1954; 1955 | Image/StillImage | uum_gcya |
18 |
| Addition to building for Nephi processing plant, Nephi, Utah: electrical layout main floor plan, preliminary drawing | 1951; 1952 | Image/StillImage | uum_gcya |
19 |
| Addition to building for Nephi processing plant, Nephi, Utah: plot plan, basement floor plan, main floor plan [preliminary drawing] | 1953-01-28 | Image/StillImage | uum_gcya |
20 |
| Basement plan, scheme A [Nephi processing plant preliminary drawing] | 1951; 1952 | Image/StillImage | uum_gcya |
21 |
| Basement plan, scheme B [Nephi processing plant preliminary drawing] | 1952-02-18 | Image/StillImage | uum_gcya |
22 |
| Building for Nephi Processing Corp., Nephi, Utah: plot plan | 1945-07-10 | Image/StillImage | uum_gcya |
23 |
| Building for Nephi Processing Corp., Nephi, Utah: sheet no. 1: Footing & foundation | 1945-07-19 | Image/StillImage | uum_gcya |
24 |
| Building for Nephi Processing Corp., Nephi, Utah: sheet no. 2: Main floor plan | 1945-07 | Image/StillImage | uum_gcya |
25 |
| Building for Nephi Processing Corp., Nephi, Utah: sheet no. 3: East elevation, west elevation, south elevation, north elevation | 1945-07 | Image/StillImage | uum_gcya |
26 |
| Building for Nephi Processing Corp., Nephi, Utah: sheet no. 4: Cross section; details | 1945-07 | Image/StillImage | uum_gcya |
27 |
| Building for Nephi Processing Corp., Nephi, Utah: sheet no. 5: drainage & sewage disposal system | 1945-07-21 | Image/StillImage | uum_gcya |
28 |
| Building for Nephi Processing Corp., Nephi, Utah: sheet no. 6: electrical plan | 1945-08 | Image/StillImage | uum_gcya |
29 |
| Building for Nephi Processing Corp., Nephi, Utah: sheet no. 7: heating plan | 1945-08 | Image/StillImage | uum_gcya |
30 |
| Column cross section [Nephi turkey processing plant, preliminary drawing] | 1952-03-06 | Image/StillImage | uum_gcya |
31 |
| Column details, Nephi processing plant, Nephi Processing Corp.: sheet no. 1 [columns] | 1953-03-05 | Image/StillImage | uum_gcya |
32 |
| Cross section [Nephi turkey processing plant, preliminary drawing] | 1951; 1952 | Image/StillImage | uum_gcya |
33 |
| Cross section, Nephi processing plant, rough drawing | 1951; 1952 | Image/StillImage | uum_gcya |
34 |
| First floor plan, Nephi processing plant preliminary drawing | 1951; 1952 | Image/StillImage | uum_gcya |
35 |
| First floor plan, Nephi processing plant preliminary drawing | 1951; 1952 | Image/StillImage | uum_gcya |
36 |
| First floor plan, Nephi processing plant rough drawing | 1951; 1952; 1953 | Image/StillImage | uum_gcya |
37 |
| First floor plan, Nephi processing plant rough drawing | 1951; 1952; 1953 | Image/StillImage | uum_gcya |
38 |
| First floor plan, Nephi processing plant rough drawing | 1951; 1952 | Image/StillImage | uum_gcya |
39 |
| First floor plan, Nephi processing plant rough drawing | 1951; 1952 | Image/StillImage | uum_gcya |
40 |
| Floor plan, Nephi processing plant, rough drawing | 1951; 1952 | Image/StillImage | uum_gcya |
41 |
| Floor plan, scheme A [Nephi processing plant preliminary drawing] | 1951; 1952 | Image/StillImage | uum_gcya |
42 |
| Floor plan, scheme B [Nephi processing plant preliminary drawing] | 1952-02-18 | Image/StillImage | uum_gcya |
43 |
| Footing & foundation plan [Nephi processing plant preliminary drawing] | 1945 | Image/StillImage | uum_gcya |
44 |
| Foundation and footing plan, turkey plant | 1951; 1952; 1953 | Image/StillImage | uum_gcya |
45 |
| Glazed walls [Nephi processing plant preliminary drawing] | 1951; 1952 | Image/StillImage | uum_gcya |
46 |
| Jamb, mullion detail [Nephi processing plant rough drawing] | 1951; 1952 | Image/StillImage | uum_gcya |
47 |
| Longitudinal section (void) [Nephi processing plant preliminary drawing] | 1951; 1952 | Image/StillImage | uum_gcya |
48 |
| Nephi Processing Corporation, Nephi, Utah: Drawing no. 2278-B | 1952-02-19 | Image/StillImage | uum_gcya |
49 |
| Nephi Processing Corporation, Nephi, Utah: Drawing no. 2278-C | 1952-02-20 | Image/StillImage | uum_gcya |
50 |
| Nephi processing plant [preliminary floor plan] | 1945-07-10 | Image/StillImage | uum_gcya |
51 |
| Nephi processing plant preliminary drawing of section detail | 1945; 1951; 1952; 1953 | Image/StillImage | uum_gcya |
52 |
| Nephi processing plant preliminary drawing of section detail | 1945; 1951; 1952; 1953 | Image/StillImage | uum_gcya |
53 |
| Nephi processing plant preliminary drawing, first and second floors, rough drawings | 1951; 1952 | Image/StillImage | uum_gcya |
54 |
| Nephi processing plant preliminary drawing, Section Y - Y' [void] | 1951; 1952 | Image/StillImage | uum_gcya |
55 |
| Nephi processing plant rough drawing of elevations | 1951; 1952 | Image/StillImage | uum_gcya |
56 |
| Nephi processing plant rough section drawing | 1951; 1952 | Image/StillImage | uum_gcya |
57 |
| Nephi processing plant rough section drawing | 1951; 1952 | Image/StillImage | uum_gcya |
58 |
| Nephi processing plant, boiler plant & heating specifications | 1945-08-15 | Image/StillImage | uum_gcya |
59 |
| Nephi processing plant, inc. box conveying system: Section conveyor system | 1953-02-27 | Image/StillImage | uum_gcya |
60 |
| Nephi turkey processing plant roof framing plan, preliminary drawing | 1953 | Image/StillImage | uum_gcya |
61 |
| Nephi turkey processing plant, incomplete preliminary drawing | 1945; 1951; 1952; 1953 | Image/StillImage | uum_gcya |
62 |
| Nephi turkey processing plant, preliminary cross sections, building and chill room | 1945 | Image/StillImage | uum_gcya |
63 |
| Nephi turkey processing plant, preliminary drawing of box storage area | 1945; 1951; 1952; 1953 | Image/StillImage | uum_gcya |
64 |
| Nephi turkey processing plant, preliminary drawing of longitudinal cross section | 1951; 1952 | Image/StillImage | uum_gcya |
65 |
| Nephi turkey processing plant, preliminary floor plan for additions | 1951; 1952 | Image/StillImage | uum_gcya |
66 |
| Nephi turkey processing plant, preliminary floor plan for additions | 1951; 1952 | Image/StillImage | uum_gcya |
67 |
| Nephi turkey processing plant, revised distribution panel: riser diagram, 3-phase, 240 volt service schematic | 1953-05-18 | Image/StillImage | uum_gcya |
68 |
| Nephi turkey processing plant, rough drawing of Men's and Ladies' rooms | 1945; 1951; 1952; 1953 | Image/StillImage | uum_gcya |
69 |
| Nephi turkey processing plant, rough drawing with figures | 1945; 1951; 1952; 1953 | Image/StillImage | uum_gcya |
70 |
| Nephi turkey processing plant, rough drawing with figures | 1945; 1951; 1952; 1953 | Image/StillImage | uum_gcya |
71 |
| Nephi turkey processing plant, rough drawing with figures | 1945; 1951; 1952; 1953 | Image/StillImage | uum_gcya |
72 |
| Nephi turkey processing plant, rough drawing, possibly from roof framing plan | 1951; 1952 | Image/StillImage | uum_gcya |
73 |
| Nephi turkey processing plant, rough floor plan for basement | 1951; 1952 | Image/StillImage | uum_gcya |
74 |
| Nephi turkey processing plant, rough floor plan for offices | 1951; 1952 | Image/StillImage | uum_gcya |
75 |
| Nephi turkey processing plant, rough floor plan for offices | 1951; 1952 | Image/StillImage | uum_gcya |
76 |
| Nephi turkey processing plant, rough floor plan for offices | 1951; 1952; 1953 | Image/StillImage | uum_gcya |
77 |
| Office & lunch rm control [Nephi turkey processing plant] | 1951; 1952; 1953 | Image/StillImage | uum_gcya |
78 |
| Pallett layout [Nephi processing plant preliminary drawing] | 1945; 1951; 1952; 1953 | Image/StillImage | uum_gcya |
79 |
| Pioneer interview, Alice L. (Richardson) Gilson | 1938-10-07 | Text | dha_wpabs |
80 |
| Plan, truck loading platform, Nephi processing plant [rough drawing] | 1945-07-05 | Image/StillImage | uum_gcya |
81 |
| Proposed addition, Nephi Processing Corp., Nephi, Utah: [sheet] 1, basement floor | 1951-12-10 | Image/StillImage | uum_gcya |
82 |
| Proposed addition, Nephi Processing Corp., Nephi, Utah: [sheet] 1, basement floor [preliminary drawing] | 1951-12-10 | Image/StillImage | uum_gcya |
83 |
| Proposed addition, Nephi Processing Corp., Nephi, Utah: [sheet] 2, main floor | 1951-12-10 | Image/StillImage | uum_gcya |
84 |
| Proposed addition, Nephi Processing Corp., Nephi, Utah: [sheet] 3, cross section, east elevation | 1951-12-10 | Image/StillImage | uum_gcya |
85 |
| Remodeling & addition for Nephi Processing Corp., Nephi, Utah: basement floor plan | 1951-01-15 | Image/StillImage | uum_gcya |
86 |
| Remodeling & addition for Nephi Processing Corp., Nephi, Utah: main floor plan | 1951-01-15 | Image/StillImage | uum_gcya |
87 |
| Remodeling & addition for Nephi Processing Corp., Nephi, Utah: west elevation, north elevation, Section A-A', Section B - B' | 1951 | Image/StillImage | uum_gcya |
88 |
| Rough drawing of evisceration room, Nephi turkey processing plant | 1945; 1951; 1952; 1953 | Image/StillImage | uum_gcya |
89 |
| Rough drawing of evisceration room, Nephi turkey processing plant | 1945; 1951; 1952; 1953 | Image/StillImage | uum_gcya |
90 |
| Schedule of bar types | 1951; 1952; 1953 | Image/StillImage | uum_gcya |
91 |
| Schematic, building for Nephi Processing Corp., Nephi, Utah: south elevation, east elevation | 1945-07-10 | Image/StillImage | uum_gcya |
92 |
| Scheme #1, Nephi processing plant, preliminary drawing] | 1951-02-12 | Image/StillImage | uum_gcya |
93 |
| Scheme #2, Nephi processing plant, | 1951-02-12 | Image/StillImage | uum_gcya |
94 |
| Scheme 1, Scheme 2 [Nephi processing plant lunch room preliminary plans] | 1951; 1952 | Image/StillImage | uum_gcya |
95 |
| Second floor plan [Nephi processing plant preliminary drawing] | 1951; 1952 | Image/StillImage | uum_gcya |
96 |
| Section at deep freeze [Nephi turkey processing plant] | 1952-03-04 | Image/StillImage | uum_gcya |
97 |
| Section at eviserating rm [Nephi processing plant preliminary drawing] | 1952-03-04 | Image/StillImage | uum_gcya |
98 |
| Section at office [Nephi processing plant rough drawing] | 1952-03-04 | Image/StillImage | uum_gcya |
99 |
| Section at storge rm [Nephi processing plant preliminary drawing] | 1952-03-04 | Image/StillImage | uum_gcya |
100 |
| Section thru Clerestory office & eviscerating rm [Nephi processing plant preliminary drawing] | 1945; 1951; 1952; 1953 | Image/StillImage | uum_gcya |
101 |
| Section thru entrance [Nephi processing plant preliminary drawing] | 1951-02-19 | Image/StillImage | uum_gcya |
102 |
| Section thru exterior stairs to basement storage rm [Nephi processing plant preliminary drawing] | 1951; 1952 | Image/StillImage | uum_gcya |
103 |
| Section X - X' [Nephi processing plant preliminary drawing] | 1952-03-06 | Image/StillImage | uum_gcya |
104 |
| Section Y - Y (void) [Nephi processing plant preliminary drawing] | 1951; 1952 | Image/StillImage | uum_gcya |
105 |
| Section Y - Y' [Nephi processing plant preliminary drawing] | 1952-03-06 | Image/StillImage | uum_gcya |
106 |
| Sheet #5 [Nephi turkey processing plant, preliminary floor plan] | 1945; 1951; 1952; 1953 | Image/StillImage | uum_gcya |
107 |
| Stairwell section, Nephi processing plant preliminary drawing | 1945; 1951; 1952; 1953 | Image/StillImage | uum_gcya |
108 |
| Stoker and boiler diagrams, preliminary drawings, Nephi turkey processing plant | 1951; 1952; 1953 | Image/StillImage | uum_gcya |
109 |
| Trusses for future addition [Nephi turkey processing plant] | 1951; 1952; 1953 | Image/StillImage | uum_gcya |
110 |
| Turkey plant, beam & joist schedule | 1951; 1952; 1953 | Image/StillImage | uum_gcya |
111 |
| Turkey processing plant: first floor framing plan | 1952-04-17 | Image/StillImage | uum_gcya |
112 |
| Turkey processing plant: footing schedule | 1951; 1952; 1953 | Image/StillImage | uum_gcya |
113 |
| Unit heater piping [preliminary drawing, Nephi turkey processing plant] | 1945 | Image/StillImage | uum_gcya |
114 |
| Wall section eviscerating rm & quick freeze [Nephi processing plant preliminary drawing] | 1951; 1952 | Image/StillImage | uum_gcya |
115 |
| Wall section freeze & storage rm [Nephi processing plant preliminary drawing] | 1951; 1952 | Image/StillImage | uum_gcya |
116 |
| Wall section office area [Nephi processing plant preliminary drawing] | 1945; 1951; 1952; 1953 | Image/StillImage | uum_gcya |
117 |
| Wall section, Nephi processing plant preliminary drawing | 1951; 1952 | Image/StillImage | uum_gcya |