|
|
Title | Date | File Number |
1 |
 | Final report for Kennecott Work Activities, related to the unilateral administrative order for removal action: Bingham Creek channel, Phase II, Site T4: Bingham Flats, evaporation pond canals and Pond AO, volume 2 [1] | 1996-03 | 2107_005_001 |
2 |
 | Final report for Kennecott Work Activities, related to the unilateral administrative order for removal action: Bingham Creek channel, Phase II, Site T4: Bingham Flats, evaporation pond canals and Pond AO, volume 2 [2] | 1996-03 | 2107_005_002 |
3 |
 | Final report for Kennecott Work Activities, related to the unilateral administrative order for removal action: Bingham Creek channel, Phase II, Site T4: Bingham Flats, evaporation pond canals and Pond AO, volume 1 | 1995; 1996 | 2107_005_003 |
4 |
 | Mine tailings corrective action, Salt Lake County, Mountain View Golf Course, Bingham Creek culvert, 8410 South 2700 West, West Jordan, Utah; Public health assessment for Kennecott (south zone), Copperton, Salt Lake County, Utah; Enforcement Action Memorandum issued June 8, 1995, "to request and document approval of the proposed lead removal action at residential subdivisions of the Bingham Creek Channel site, West Jordan, Utah | 1995; 1996; 1997 | 2107_005_004 |
5 |
 | Salt Lake City Bingham Creek study: Data dictionary | 1994-05-24 | 2107_005_005 |
6 |
 | Bingham Creek channel sampling program analytical results | 1990; 1991; 1993; 1994; 1996 | 2107_006_001 |
7 |
 | Bingham Canyon hydrologic/geotechnical study phase II project report: interim study report | 1985-11 | 2107_006_002 |
8 |
 | Soil and tailings sample test results: Bingham Creek channel Phase III removal action | 1996-02-27 | 2107_006_003 |
9 |
 | Bingham Creek channel sampling results from John Drexler, University of Colorado | 1992; 1993; 1994; 1995; 1996 | 2107_006_004 |
10 |
 | Compilation of articles on Old Bingham Tunnel | 1992; 1993; 1994 | 2107_006_005 |
11 |
 | Reports on Bingham Creek residences soil remediation activities, 1994-1995 | 1994; 1995 | 2107_007_001 |
12 |
 | Soil / tailings sampling test results report, Bingham Creek channel, Phase III removal action, Salt Lake County, Utah | 1996-07 | 2107_007_002 |
13 |
 | Final report for Kennecott work activities related to the unilateral administrative order for removal action: Site T4, Bingham Creek channel, Phase II, Robbe cells and tailwater ditches [part 1] | 1994-11 | 2107_007_003 |
14 |
 | Final report for Kennecott work activities related to the unilateral administrative order for removal action: Site T4, Bingham Creek channel, Phase II, Robbe Cells and tailwater ditches [part 2] | 1994-11 | 2107_007_004 |
15 |
 | Closure report, Fahnian Ranchettes, Lot no. 3 | 1995 | 2107_007_005 |
16 |
 | Final report for Kennecott Work Activities, related to the unilateral administrative order for removal action: Bingham Creek channel, Phase II, Site T4: Bingham Flats, evaporation pond canals and Pond AO, volume 2 [3] | 1994 | 2107_007_006 |
17 |
 | Bingham Creek environmental and human health lead and arsenic exposure study: final report | 1996 | 2107_008_001 |
18 |
 | Sampling data, Bingham Creek Superfund cleanup project, 1996-1998 | 1996; 1997; 1998 | 2107_008_002 |
19 |
 | Record of decision: Kennecott south zone, operable unit 2, southwest Jordan River Valley ground water plumes | 2000-12-13 | 2107_008_003 |
20 |
 | Kennecott Utah Copper Corporation north facilities soils and wastewater treatment plant ponds site removal action SSID #4B: miscellaneous sampling reports and addenda from Magna and Bonneville areas | 1994; 1995; 1996; 1997; 1998; 2002 | 2107_008_004 |
21 |
 | Work plan, remedial investigation and feasibility study for ground water in the southwest Salt Lake Valley | 1995-03 | 2107_008_005 |
22 |
 | Sampling and analysis plan for the engineering evaluation/cost analysis for the Operable Unit 9-Kennecott North Soils | 1991; 1994 | 2107_009_001 |
23 |
 | Sample analysis plan for south arm of the Great Salt Lake | 1995-07-06 | 2107_009_002 |
24 |
 | Kennecott Utah Copper Corporation north facilities soils and wastewater treatment plant ponds site removal action SSID #4B, Magna area post removal and reclamation report [Part 1] | 1996; 1997 | 2107_009_003 |
25 |
 | Kennecott Utah Copper Corporation north facilities soils and wastewater treatment plant ponds site removal action SSID #4B, Magna area post removal and reclamation report [Part 2] | 1996; 1997 | 2107_009_004 |
26 |
 | Kennecott Utah Copper Corporation north facilities soils and wastewater treatment plant ponds site removal action SSID #4B, Arthur area post removal and reclamation report [Part 1] | 1996; 1997 | 2107_009_005 |
27 |
 | Kennecott Utah Copper Corporation north facilities soils and wastewater treatment plant ponds site removal action SSID #4B, Arthur area post removal and reclamation report [Part 2] | 1996; 1997 | 2107_009_006 |
28 |
 | Wastewater treatment plant sludge characterization, volume 1 | 1994-09 | 2107_009_007 |
29 |
 | Field and laboratory test data summary: tailings subgrade, clay liner, 60/80 mil geosynthetic liners Arthur step-back repository, Magna, Utah [part 1] | 1997-05-02 | 2107_010_001 |
30 |
 | Field and laboratory test data summary: tailings subgrade, clay liner, 60/80 mil geosynthetic liners Arthur step-back repository, Magna, Utah [part 2] | 1997-05-02 | 2107_010_002 |
31 |
 | Field and laboratory test data summary: tailings subgrade, clay liner, 60/80 mil geosynthetic liners Arthur step-back repository, Magna, Utah [part 3] | 1997-05-02 | 2107_010_003 |
32 |
 | Field and laboratory test data summary: tailings subgrade, clay liner, 60/80 mil geosynthetic liners Arthur step-back repository, Magna, Utah [part 4] | 1997-05-02 | 2107_010_004 |
33 |
 | Field and laboratory test data summary: tailings subgrade, clay liner, 60/80 mil geosynthetic liners Arthur step-back repository, Magna, Utah [part 5] | 1997-05-02 | 2107_010_005 |
34 |
 | Field and laboratory test data summary: tailings subgrade, clay liner, 60/80 mil geosynthetic liners Arthur step-back repository, Magna, Utah [part 6] | 1997-05-02 | 2107_010_006 |
35 |
 | Kennecott North End Technical Review Committee records, 1996-1997 | 1970-04; 1996; 1997 | 2107_011_001 |
36 |
 | Watershed reclamation preliminary assessment, surface media investigations, with a review | 1992 | 2107_011_003 |
37 |
 | Uptake of arsenic and lead by wheat at the Kennecott sites, Oquirrh Mountains, Utah; Uptake of lead and arsenic by garden vegetables: study report, Kennecott sites, Oquirrh Mountains, Utah; Ecological risk assessment, northern Oquirrh Mountains: final report | 1995; 1996 | 2107_011_004 |
38 |
 | Utah Department of Environmental Quality correspondence 1998; To move a mountain: railroads and mining in Bingham Canyon, Utah | 1998; 2001 | 2107_011_005 |
39 |
 | Final environmental impact statement: environmental analysis and technical appendices for the Kennecott tailings modernization project, volume 1 [part 1] | 1995-12 | 2107_012_001 |
40 |
 | Final environmental impact statement: environmental analysis and technical appendices for the Kennecott tailings modernization project, volume 1 [part 2] | 1995-12 | 2107_012_002 |
41 |
 | Wastewater treatment plant site characterization and sludge stabilization study | 1995; 1996; 1997; 1998 | 2107_012_004 |
42 |
 | Soil sampling and analysis report for Operable Unit 9, Kennecott North soils (Magna) | 1994-10 | 2107_012_005 |
43 |
 | North facilities soils and wastewater treatment plant ponds, site removal action SSID#4B: Bonneville area post removal and reclamation report | 1997-07 | 2107_012_006 |
44 |
 | North facilities soils and wastewater treatment plant ponds site, removal action SSID#4B: Arthur step-back repository final report [part 1] | 1997-05 | 2107_012_007 |
45 |
 | North facilities soils and wastewater treatment plant ponds site, removal action SSID#4B: Arthur step-back repository final report [part 2] | 1997-05; 1994-04-07; 1996-06 | 2107_012_008 |
46 |
 | Report on the May 1997 sampling of Lee Creek outfall, the C-7 Ditch outfall, and the Great Salt Lake: Draft | 1997-07-21 | 2107_013_001 |
47 |
 | North facilities soils and wastewater treatment plant ponds site, removal action SSID#4B: Refinery area site summaries and characterization sampling reports [part 1] | 1998 | 2107_013_002 |
48 |
 | Inorganic analysis reports for Kennecott sites: electrolyte purification building, wastewater treatment plant pond B | 1996; 1997 | 2107_013_003 |
49 |
 | Miscellaneous papers concerning reclamation projects on Kennecott north area sites | 1983; 1989; 1995; 1996; 1997; 1999; 2002 | 2107_013_004 |
50 |
 | Environmental Protection Agency Region 8 reports and correspondence, 1994-1995 | 1994; 1995 | 2107_013_005 |
51 |
 | Three papers related to environmental effects of Kennecott mining activity and waste | 1970; 1995 | 2107_013_006 |
52 |
 | North facilities soils and wastewater treatment plant ponds site, removal action SSID#4B: Refinery area site summaries and characterization sampling reports [part 2] | 1997 | 2107_013_007 |
53 |
 | Focused feasibility study, work plan for sulfates in ground water, southwest Salt Lake County, Utah | 1992-12 | 2107_014_001 |
54 |
 | Focused feasibility study for sulfates in ground water, southwest Salt Lake County, Utah: volume 1 | 1993-05-07 | 2107_014_002 |
55 |
 | Decision document: initial prescreening of groundwater alternatives for portions of the sulfate plume in southwest Jordan River Valley, Utah; Responsiveness summary, focused feasibility study, work plan for sulfates in ground water, southwest Salt Lake County, Utah | 1993 | 2107_014_003 |
56 |
 | Sampling reports, South Jordan and West Jordan, Utah [part 1] | 1994; 1995; 1996 | 2107_014_004 |
57 |
 | Sampling reports, South Jordan and West Jordan, Utah [part 2] | 1994; 1995; 1996 | 2107_014_005 |
58 |
 | Bingham Creek residential removal action reports; Groundwater characterization and monitoring plan, volume 1; Bingham Creek post removal sampling, 4800 West to 3200 West St., South Jordan and West Jordan, Utah | 1991; 1992; 1993 | 2107_014_006 |
59 |
 | Historic sites and potential source fact sheets [1] | 1992; 1993; 1994; 1995; 1996; 1997 | 2107_015_001 |
60 |
 | Historic sites and potential source fact sheets [2] | 1996; 1997 | 2107_015_002 |
61 |
 | Kennecott off-site environmental assessments for Butterfield, Midas and Copper Creeks | 1995-06-01 | 2107_015_003 |
62 |
 | Historic sites, response to EPA: "Priority One" sites; Smelter standby fuel station subsurface hydrocarbon soils investigation; Historic sites and potential source fact sheets, 1996 | 1993; 1994; 1995; 1996 | 2107_015_004 |
63 |
 | Acute toxicity of selenate to the brine shrimp, Artemia Franciscana | 1999-01 | 2107_016_001 |
64 |
 | Evaluation of selenium toxicity to the larvae of the brine fly, Ephydra cinerea | 1998-03 | 2107_016_002 |
65 |
 | Chronic toxicity of selenium to brine shrimp, Artemia franciscana | 1999-02 | 2107_016_003 |
66 |
 | Kennecott Utah Copper Corporation, North end ground water remedial investigation conceptual model report | 1998; 1999 | 2107_016_004 |
67 |
 | Chronic toxicity of arsenic to brine shrimp | 1996-07 | 2107_016_005 |
68 |
 | Miscellaneous Kennecott reports and correspondence on environmental cleanup, 1995-2002 | 1995; 1996; 1997; 1998; 1999; 2002 | 2107_016_006 |
69 |
 | Analysis report screening level for the ecological risk assessment of Kennecott Utah Copper [part 1] | 1995-01 | 2107_017_001 |
70 |
 | Analysis report screening level for the ecological risk assessment of Kennecott Utah Copper [part 2] | 1995-01 | 2107_017_002 |
71 |
 | Analysis report screening level for the ecological risk assessment of Kennecott Utah Copper [part 3] | 1995-01 | 2107_017_003 |
72 |
 | North Facilities soils and wastewater treatment plant ponds site removal action, SSID#4B: Magna area characterization, volume 2 | 2001-11 | 2107_017_004 |
73 |
 | North Facilities soils and wastewater treatment plant ponds site removal action, SSID#4B: Refinery area post removal / post reclamation, volume 6 [part 1] | 1999-06 | 2107_017_005 |
74 |
 | North Facilities soils and wastewater treatment plant ponds site removal action, SSID#4B: Refinery area post removal / post reclamation, volume 6 [part 2] | 1999-06 | 2107_017_006 |
75 |
 | North Facilities soils and wastewater treatment plant ponds site removal action, SSID#4B: Refinery area post removal / post reclamation, volume 6 [part 3] | 1999-06 | 2107_017_007 |
76 |
 | Environmental Protection Agency correspondence, 1991-2002 | 1995; 1991; 1999; 2002 | 2107_018_001 |
77 |
 | Environmental Protection Agency correspondence 1994 - 1997 | 1994; 1995; 1996; 1997 | 2107_018_002 |
78 |
 | Problem formulation report, screening level for the ecological risk assessment, Kennecott Utah Copper, Salt Lake City, Utah | 1995-08 | 2107_018_003 |
79 |
 | Analysis report, screening level for the ecological risk assessment, Kennecott Utah Copper, Salt Lake City, Utah | 1995-10 | 2107_018_005 |
80 |
 | Environmental Protection Agency correspondence and reports, 1996 - 1998 | 1996; 1997; 1998 | 2107_018_006 |
81 |
 | Detail facility reports, released to the public on Nov. 26, 2001 | 2001-11-26; 2001-12-04 | 2107_018_007 |
82 |
 | Environmental Protection Agency TRI Explorer report | 2002-05-24 | 2107_018_008 |
83 |
 | Environmental Protection Agency correspondence and data, 1995 - 2001 | 1994; 1995; 1996; 1997; 2001; 2002 | 2107_018_009 |
84 |
 | Copper mining communities and their people; Kennecott's Bingham Canyon Mine: the world's first open-pit copper mine | 1993; 1994 | 2107_018_010 |
85 |
 | Correspondence on Kennecott water studies, 1984-1994 | 1984; 1985; 1986; 1993; 1994; 2004 | 2107_018_011 |
86 |
 | Oquirrh Range site investigations, 1996 | 1996 | 2107_019_003 |
87 |
 | Environmental Protection Agency correspondence on Bingham Creek, 1990s | 1992; 1993; 1994; 1995; 1998 | 2107_019_004 |
88 |
 | Environmental Protection Agency Superfund documents, 1984 - 1998 | 1984; 1994; 1995; 1997; 1998 | 2107_019_005 |
89 |
 | Environmental Protection Agency correspondence, 1991-1994 concerning Bastian Ditch, Bastian Pit, and Cemetery Pond | 1909; 1929; 1991; 1994 | 2107_019_006 |
90 |
 | Environmental Protection Agency correspondence on Superfund sites, 1981 - 1994 | 1981; 1986; 1990; 1992; 1993; 1994 | 2107_019_007 |
91 |
 | Environmental issues clippings, 1993 - 2004 | 1993; 1994; 1995; 1996; 1997; 1998; 1999; 2000; 2001; 2002; 2003; 2004 | 2107_020_001 |
92 |
 | Environmental Protection Agency correspondence on Kennecott's inclusion on the National Priorities List of Superfund sites, 1991 - 1995 | 1991; 1992; 1993; 1994; 1995 | 2107_020_003 |
93 |
 | Butterfield Canyon ecological risk assessment: a supplement to the September 1996 ecological risk assessment, northern Oquirrh Mountains | 1997 | 2107_021_001 |
94 |
 | Environmental Protection Agency Region 8 correspondence and documents concerning soil contamination, 1995 - 1998 | 1995; 1996; 1997; 1998 | 2107_021_002 |
95 |
 | South Jordan evaporation ponds, pond sediment and soil investigation work plan, Kennecott Utah Copper, Bingham Canyon, Utah; South Jordan evaporation ponds, pond sediment and soil investigation report, volume 1 | 1994; 1998 | 2107_021_003 |
96 |
 | Environmental Protection Agency Region 8 correspondence and documents concerning South Jordan evaporation ponds Superfund site, 1994-2002 | 1994; 1995; 1996; 2002 | 2107_021_004 |
97 |
 | Environmental Protection Agency Region 8 correspondence and documents concerning South Jordan evaporation ponds Superfund site, 1994-2003 | 1987; 1994; 1997; 2003 | 2107_021_005 |
98 |
 | Site-specific integrated exposure uptake biokinetic modeling: Kennecott baseline risk assessment; Risk assessment strategy document: Kennecott site risk assessment support | 1995-06-28; 1996-07-20 | 2107_021_006 |
99 |
 | Environmental Protection Agency correspondence and documents about risk assessment at Superfund sites, 2001 | 2001 | 2107_021_007 |
100 |
 | Environmental Protection Agency correspondence concerning South Jordan evaporation ponds, 1993-1997 | 1965; 1966; 1993; 1994; 1995; 1997 | 2107_022_001 |