1 - 100 of 59
Number of results to display per page
TitleCollection Number And NamePhoto Number
1 Erosion, North Salt Lake 1932 [and] Erosion west of Salt Lake, on north point of Oquirrh MountainsP0208 Utah Flood Survey photograph collectionP0208n01_01_001-002
2 Flooding in Willard, Utah : scenes along Main Street, Willard, following the flood of August 13, 1923P0208 Utah Flood Survey photograph collectionP0208n01_01_003-004
3 Flooding in Willard, Utah : looking down Main Street, Willard, from the north end of the town, August 18, 1923 [and] Barn containing livestock, automobile trucks and 75 tons of hay, carried 1/4 mile and deposited on Main StreetP0208 Utah Flood Survey photograph collectionP0208n01_01_005-006
4 Flooding in Willard, Utah : site of the Willard flood barrier, Septembre 3, 1923 [and] same May 10, 1924, two days after construction began.P0208 Utah Flood Survey photograph collectionP0208n01_01_007-008
5 Flooding in Willard, Utah : Willard barrier basin in 1925P0208 Utah Flood Survey photograph collectionP0208n01_01_009-010
6 Flooding in Willard, Utah : Willard barrier at the close of the second high water season following control, June 1926 [and] A closeup of the spillway, same dateP0208 Utah Flood Survey photograph collectionP0208n01_01_011-012
7 Flooding in Willard, Utah : Interior of the new barrier basin, June 1925 [and] Raising the outer bank still higher, July 1926, just previous to summer flood.P0208 Utah Flood Survey photograph collectionP0208n01_01_013-014
8 Flooding in Willard, Utah : Closing an opening through one of the central deflectors at upper end of Willard barrier basin [and] Southwest corner of Willard barrier, July 20, 1925, during the second season of operationP0208 Utah Flood Survey photograph collectionP0208n01_01_015-016
9 Flooding in Willard, Utah : Timber, coarse straw and boulders used to define the limits of the Willard barrier basin [and] Another view of the barrier during the first few days of constructionP0208 Utah Flood Survey photograph collectionP0208n01_01_017-018
10 Flooding in Willard, Utah : "beaver dam" built by man to divert the stream (Willard Creek) into the barrier basin [and] Temporary spillway just above highway crossingP0208 Utah Flood Survey photograph collectionP0208n01_01_019-020
11 Flooding in Willard, Utah : Emergency highway crossing of flood control channel, with teams at work endeavoring to keep the channel open [date] [and] the same 5 days laterP0208 Utah Flood Survey photograph collectionP0208n01_01_021-022
12 Flooding in Willard, Utah : Railroad crossing at Willard Creek 2 days after stream was placed under control [and] crib and rock protection in Willard Canyon beneath a 75 foot bank of gravelP0208 Utah Flood Survey photograph collectionP0208n01_01_023-024
13 Farmington floods : Farmington flood barrier in its early stages of development [and] The same successfully controlling a heavy torrential flood on July 3, 1925P0208 Utah Flood Survey photograph collectionP0208n01_01_025-026
14 Farmington floods : Farmington spillway following a torrential flood [ad] Debris deposited above the Farmington barrier by the flood of July 3, 1926P0208 Utah Flood Survey photograph collectionP0208n01_01_027-028
15 Farmington floods : Farmington spillway of rubble-concrete during the first season of operation, April 1925 [and] The same in 1927P0208 Utah Flood Survey photograph collectionP0208n01_01_029-030
16 Farmington floods : Farmington flood barrier at the close of a season of excessive high water [and] Looking up stream from spillway into Farmington barrier basinP0208 Utah Flood Survey photograph collectionP0208n01_01_031-032
17 Ford Creek floods : Ford Creek, Davis County, after the third torrential flood in recent yearsP0208 Utah Flood Survey photograph collectionP0208n01_01_033
18 Ford Creek floods : Result of and flow from torrential flood, Ford Creek, August 13, 1923 [and] The disaster of 1923 repeated on Ford Creek in a series of three floods in 1930P0208 Utah Flood Survey photograph collectionP0208n01_01_034-035
19 Ford Creek floods : Ford Creek in 1924 following 1923 floods [and] Looking across state highway at Ford Creek following 1930 floodP0208 Utah Flood Survey photograph collectionP0208n01_01_036-037
20 Parrish Creek and Centerville flooding : Parrish Creek showing Centerville school in the midst of an area devastated by the floods of 1930 [and] Remnants of a home on Parrish Creek near the Centerville school, September 1930P0208 Utah Flood Survey photograph collectionP0208n01_01_038-039
21 Parrish Creek and Centerville flooding : Highway below Centerville School, Parrish Creek 1930 floods [and] Another home near Centerville School 1930P0208 Utah Flood Survey photograph collectionP0208n01_01_040-041
22 Parrish Creek and Centerville flooding : Two pictures showing consistency of mud flows in Davis County floodsP0208 Utah Flood Survey photograph collectionP0208n01_01_042-043
23 Digging the state highway out after a typical Davis County flood [and] A minor flood from Steed Creek blocked the highway as indicatedP0208 Utah Flood Survey photograph collectionP0208n01_01_044-045
24 Highway fo Steed Creek crossing during torrential flood, looking upstream [and] A woven wire fence parallel to direction of flow held a torrential flood within bounds, just above highway crossing at Fiddler's Creek near Cedar CityP0208 Utah Flood Survey photograph collectionP0208n01_01_046-047
25 Bingham was also severely hit by flood and fire [and] Weber Canyon, Aug. 1930, looking down stream where torrential flood carried a dam completely across the river, forcing the stream to flow down the highwayP0208 Utah Flood Survey photograph collectionP0208n01_01_048-049
26 Salt Creek flooding : Looking up stream across Salt Creek upper barrier after it had been in operation two years [and] Spillway through above barrierP0208 Utah Flood Survey photograph collectionP0208n01_01_050-051
27 Salt Creek flooding : Lower barrier on Salt Creek above Nephi at the beginning of the third season of operation [and] Salt Creek out of bounds at Plaster Mill above Nephi, on the evening of Aug. 13, 1923P0208 Utah Flood Survey photograph collectionP0208n01_01_052-053
28 Chalk Creek flooding : Chalk Creek before control in 1921 [and] Chalk Creek barrier and spillway which for ten years has successfully controlled floodsP0208 Utah Flood Survey photograph collectionP0208n01_01_054-055
29 Kanosh Creek : Kanosh Creek barrier and spillway soon after completion [and] The same after two seasons of heavy useP0208 Utah Flood Survey photograph collectionP0208n01_01_056-057
30 Parowan City flood barrier : Sand and gravel were a serious menace to Parowan City and to the irrigation system before the barrier was built in 1925 [and] Gravel deposited above the Parowan flood barrier supplies the building needs of the communityP0208 Utah Flood Survey photograph collectionP0208n01_01_058-059
31 Parowan City flood barrier : Parowan barrier after a terrific summer flood [and] Parowan barrier spillwayP0208 Utah Flood Survey photograph collectionP0208n01_01_060-061
32 Shoal Creek Dam : Excavation for Shoal Creek diversion dam above Enterprise [and] The same after dam was finally completedP0208 Utah Flood Survey photograph collectionP0208n01_01_062-063
33 Shoal Creek Dam : Looking up stream through spillway of Shoal Creek diversion dam [and] The same looking down streamP0208 Utah Flood Survey photograph collectionP0208n01_01_064-065
34 Shoal Creek Dam : Equalizing reservoir no. 1 on Shoal Creek [and] Equalizing reservoir no. 2 on Shoal CreekP0208 Utah Flood Survey photograph collectionP0208n01_01_066-067
35 Summit Flood Control Dam : Constructing flood control diversion dam at Summit [and] The same after completion and after a terrific summer flood carrying boulders weighing tons eachP0208 Utah Flood Survey photograph collectionP0208n01_01_068-069
36 Diversion dam above Orderville [and] Diversion dam above Escalante in Potato ValleyP0208 Utah Flood Survey photograph collectionP0208n01_01_070-071
37 Diversion dam on Canal Creek, after a terrific flood in July 1922 [and] Diversion dam on Haights Creek, buried by a devastating flood July 3, 1926P0208 Utah Flood Survey photograph collectionP0208n01_01_072-073
38 Mount Pleasant flood barrier spillway nearing completion November 11, 1928 looking downstream [and] The same in September 1929 following a terrific mud and boulder flow looking up streamP0208 Utah Flood Survey photograph collectionP0208n01_01_075-074
39 Manti barrier at the close of the high water season [and] Manti barrier spillway in operationP0208 Utah Flood Survey photograph collectionP0208n01_01_076-077
40 Spillway on Payson Creek : Constructing the main barrier and spillway in Pigeon Creek, rocks dragged into place by teams are grouted with concrete to hold them in position [and] A secondary spillway on Payson Creek made of timberP0208 Utah Flood Survey photograph collectionP0208n01_01_078-079
41 Erosion on Santa Clara Creek is a problem of great concern to the farmers of St. George and Santa ClaraP0208 Utah Flood Survey photograph collectionP0208n01_01_080
42 Erosion on Santa Clara Creek : an attempt at control on Santa Clara CreekP0208 Utah Flood Survey photograph collectionP0208n01_01_081
43 Woodruff spillway : Woodruff equalizing reservoir, showing first construction camp, 1926, and beginning of the new dam [and] Woodruff spillway at the height of 24 ft., which was the first level reachedP0208 Utah Flood Survey photograph collectionP0208n01_01_082-083
44 Woodruff Reservoir spring of 1930 during the time of heaviest spring floods [and] Woodruff spillway 1930P0208 Utah Flood Survey photograph collectionP0208n01_01_084-085
45 Kessler Canyon barrier spillway looking downstream toward Garfield smelter [and] The same after a forrential flood which reached a depth of 7 feet over the 70 foot crestP0208 Utah Flood Survey photograph collectionP0208n01_01_086-087
46 Kessler Canyon barrier spillway : looking up stream from Garfield smelter at series of control structures in Kessler Canyon [and] Looking down stream across site of main barrier spillway, Kessler Canyon, during constructionP0208 Utah Flood Survey photograph collectionP0208n01_01_088-089
47 Kessler Canyon barrier spillway : Lifting boulders out of the ground for use in building main spillway, Kessler Canyon [and] Boulders being placed by heavy derrick, in foundation of main spillway, Kessler CanyonP0208 Utah Flood Survey photograph collectionP0208n01_01_090-091
48 Kessler Canyon barrier spillway : building an equalizing check above intake to tunnel through Garfield Smelter [and] Constructing a check dam in Kessler Canyon below main structureP0208 Utah Flood Survey photograph collectionP0208n01_01_092-093
49 Kessler Canyon barrier spillway : looking down stream from main spillway, Kessler Canyon [and] Detail of rubble-concrete constructionP0208 Utah Flood Survey photograph collectionP0208n01_01_094-095
50 Kessler Canyon barrier spillway : Guniting a rubble-concrete wing wall, Kessler Canyon [and] Gasoline driven shovel building the flood barrier, Kessler CanyonP0208 Utah Flood Survey photograph collectionP0208n01_01_096-097
51 Kessler Canyon barrier spillway : spillway through man barrier, Kessler Canyon [and] The flood stream drops over a circular crest into a stilling pondP0208 Utah Flood Survey photograph collectionP0208n01_01_098-099
52 Erosion of foot hills near Bountiful, showing goat herd which grazes over the Bountiful water-shed [and] Near the crest of the Davis County water-shed where floods originateP0208 Utah Flood Survey photograph collectionP0208n01_01_100-101
53 Haights Creek Diversion dam in process of constructionP0208 Utah Flood Survey photograph collectionP0208n01_01_102
54 Chalk Creek before control, looking up stream during period of highwater in spring, when stream was carrying large quantities of gravel [and] Looking up stream across north end of Fillmore barrier, first season of operationP0208 Utah Flood Survey photograph collectionP0208n01_01_103-104
55 Farmington, August 1924, commencement of spillway and barrierP0208 Utah Flood Survey photograph collectionP0208n01_01_105-106
56 Looking down Cottonwood Creek at Farmington after flood of 1922 and before barrier construction [and] Farmington spillway, first season of operationP0208 Utah Flood Survey photograph collectionP0208n01_01_107-108
57 Farmington spillway before first season of operationP0208 Utah Flood Survey photograph collectionP0208n01_01_109
58 Enterprise flood dam in process of constructionP0208 Utah Flood Survey photograph collectionP0208n01_01_110
59 Kessler Canyon main spillway structureP0208 Utah Flood Survey photograph collectionP0208n01_01_111
1 - 100 of 59