Title | Collection Number And Name | Photo Number | ||
---|---|---|---|---|
1 | Spillway on Payson Creek : Constructing the main barrier and spillway in Pigeon Creek, rocks dragged into place by teams are grouted with concrete to hold them in position [and] A secondary spillway on Payson Creek made of timber | P0208 Utah Flood Survey photograph collection | P0208n01_01_078-079 |