1 - 25 of 21
Number of results to display per page
TitleDateType
1 Chalk Creek before control, looking up stream during period of highwater in spring, when stream was carrying large quantities of gravel [and] Looking up stream across north end of Fillmore barrier, first season of operation1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933Image/StillImage
2 Diversion dam on Canal Creek, after a terrific flood in July 1922 [and] Diversion dam on Haights Creek, buried by a devastating flood July 3, 19261922; 1926Image/StillImage
3 Enterprise flood dam in process of construction1924; 1925; 1926Image/StillImage
4 Erosion of foot hills near Bountiful, showing goat herd which grazes over the Bountiful water-shed [and] Near the crest of the Davis County water-shed where floods originate1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933Image/StillImage
5 Erosion on Santa Clara Creek : an attempt at control on Santa Clara Creek1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933Image/StillImage
6 Erosion on Santa Clara Creek is a problem of great concern to the farmers of St. George and Santa Clara1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933Image/StillImage
7 Farmington floods : Farmington flood barrier at the close of a season of excessive high water [and] Looking up stream from spillway into Farmington barrier basin1926Image/StillImage
8 Farmington floods : Farmington spillway following a torrential flood [ad] Debris deposited above the Farmington barrier by the flood of July 3, 19261926Image/StillImage
9 Haights Creek Diversion dam in process of construction1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933Image/StillImage
10 Kessler Canyon barrier spillway : building an equalizing check above intake to tunnel through Garfield Smelter [and] Constructing a check dam in Kessler Canyon below main structure1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933Image/StillImage
11 Kessler Canyon barrier spillway : Guniting a rubble-concrete wing wall, Kessler Canyon [and] Gasoline driven shovel building the flood barrier, Kessler Canyon1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933Image/StillImage
12 Kessler Canyon barrier spillway : Lifting boulders out of the ground for use in building main spillway, Kessler Canyon [and] Boulders being placed by heavy derrick, in foundation of main spillway, Kessler Canyon1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933Image/StillImage
13 Kessler Canyon barrier spillway : looking down stream from main spillway, Kessler Canyon [and] Detail of rubble-concrete construction1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933Image/StillImage
14 Kessler Canyon barrier spillway : looking up stream from Garfield smelter at series of control structures in Kessler Canyon [and] Looking down stream across site of main barrier spillway, Kessler Canyon, during construction1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933Image/StillImage
15 Kessler Canyon barrier spillway : spillway through man barrier, Kessler Canyon [and] The flood stream drops over a circular crest into a stilling pond1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933Image/StillImage
16 Kessler Canyon barrier spillway looking downstream toward Garfield smelter [and] The same after a forrential flood which reached a depth of 7 feet over the 70 foot crest1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933Image/StillImage
17 Kessler Canyon main spillway structure1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933Image/StillImage
18 Manti barrier at the close of the high water season [and] Manti barrier spillway in operation1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933Image/StillImage
19 Parowan City flood barrier : Parowan barrier after a terrific summer flood [and] Parowan barrier spillway1925; 1926Image/StillImage
20 Spillway on Payson Creek : Constructing the main barrier and spillway in Pigeon Creek, rocks dragged into place by teams are grouted with concrete to hold them in position [and] A secondary spillway on Payson Creek made of timber1923; 1924; 1925; 1926; 1927; 1928; 1929; 1930; 1931; 1932; 1933Image/StillImage
21 Woodruff spillway : Woodruff equalizing reservoir, showing first construction camp, 1926, and beginning of the new dam [and] Woodruff spillway at the height of 24 ft., which was the first level reached1926Image/StillImage
1 - 25 of 21