Home
Browse
Ask Us
Chat
Harmful Language Statement
Log in
Photo Archives
Advanced Search
About
Over 70,000 photos covering a variety of topics from Marriott Library Special Collections
Year
1923
1924
1925
1926
1927
1928
1929
1930
1931
1932
1933
TO
1923
1924
1925
1926
1927
1928
1929
1930
1931
1932
1933
Type
Image/StillImage
21
Format
image/jpeg
21
Collection Name
Utah Flood Survey
21
Filters:
Collection Name:
"Utah Flood Survey"
Date:
"1923"
Format:
"image/jpeg"
Collection:
"uum_map"
1
-
25
of
21
Gallery view
Number of results to display per page
10
25
50
100
200
Sort by Relevance
Sort by Title A-Z
Sort by Title Z-A
Sort by Date Ascending
Sort by Date Descending
Sort by Last Modified Ascending
Sort by Last Modified Descending
Sort by Photo Number
Title
Collection Number And Name
Photo Number
1
Flooding in Willard, Utah : scenes along Main Street, Willard, following the flood of August 13, 1923
P0208 Utah Flood Survey photograph collection
P0208n01_01_003-004
2
Flooding in Willard, Utah : looking down Main Street, Willard, from the north end of the town, August 18, 1923 [and] Barn containing livestock, automobile trucks and 75 tons of hay, carried 1/4 mile and deposited on Main Street
P0208 Utah Flood Survey photograph collection
P0208n01_01_005-006
3
Flooding in Willard, Utah : site of the Willard flood barrier, Septembre 3, 1923 [and] same May 10, 1924, two days after construction began.
P0208 Utah Flood Survey photograph collection
P0208n01_01_007-008
4
Ford Creek floods : Result of and flow from torrential flood, Ford Creek, August 13, 1923 [and] The disaster of 1923 repeated on Ford Creek in a series of three floods in 1930
P0208 Utah Flood Survey photograph collection
P0208n01_01_034-035
5
Salt Creek flooding : Lower barrier on Salt Creek above Nephi at the beginning of the third season of operation [and] Salt Creek out of bounds at Plaster Mill above Nephi, on the evening of Aug. 13, 1923
P0208 Utah Flood Survey photograph collection
P0208n01_01_052-053
6
Parowan City flood barrier : Sand and gravel were a serious menace to Parowan City and to the irrigation system before the barrier was built in 1925 [and] Gravel deposited above the Parowan flood barrier supplies the building needs of the community
P0208 Utah Flood Survey photograph collection
P0208n01_01_058-059
7
Manti barrier at the close of the high water season [and] Manti barrier spillway in operation
P0208 Utah Flood Survey photograph collection
P0208n01_01_076-077
8
Spillway on Payson Creek : Constructing the main barrier and spillway in Pigeon Creek, rocks dragged into place by teams are grouted with concrete to hold them in position [and] A secondary spillway on Payson Creek made of timber
P0208 Utah Flood Survey photograph collection
P0208n01_01_078-079
9
Erosion on Santa Clara Creek is a problem of great concern to the farmers of St. George and Santa Clara
P0208 Utah Flood Survey photograph collection
P0208n01_01_080
10
Erosion on Santa Clara Creek : an attempt at control on Santa Clara Creek
P0208 Utah Flood Survey photograph collection
P0208n01_01_081
11
Kessler Canyon barrier spillway looking downstream toward Garfield smelter [and] The same after a forrential flood which reached a depth of 7 feet over the 70 foot crest
P0208 Utah Flood Survey photograph collection
P0208n01_01_086-087
12
Kessler Canyon barrier spillway : looking up stream from Garfield smelter at series of control structures in Kessler Canyon [and] Looking down stream across site of main barrier spillway, Kessler Canyon, during construction
P0208 Utah Flood Survey photograph collection
P0208n01_01_088-089
13
Kessler Canyon barrier spillway : Lifting boulders out of the ground for use in building main spillway, Kessler Canyon [and] Boulders being placed by heavy derrick, in foundation of main spillway, Kessler Canyon
P0208 Utah Flood Survey photograph collection
P0208n01_01_090-091
14
Kessler Canyon barrier spillway : building an equalizing check above intake to tunnel through Garfield Smelter [and] Constructing a check dam in Kessler Canyon below main structure
P0208 Utah Flood Survey photograph collection
P0208n01_01_092-093
15
Kessler Canyon barrier spillway : looking down stream from main spillway, Kessler Canyon [and] Detail of rubble-concrete construction
P0208 Utah Flood Survey photograph collection
P0208n01_01_094-095
16
Kessler Canyon barrier spillway : Guniting a rubble-concrete wing wall, Kessler Canyon [and] Gasoline driven shovel building the flood barrier, Kessler Canyon
P0208 Utah Flood Survey photograph collection
P0208n01_01_096-097
17
Kessler Canyon barrier spillway : spillway through man barrier, Kessler Canyon [and] The flood stream drops over a circular crest into a stilling pond
P0208 Utah Flood Survey photograph collection
P0208n01_01_098-099
18
Erosion of foot hills near Bountiful, showing goat herd which grazes over the Bountiful water-shed [and] Near the crest of the Davis County water-shed where floods originate
P0208 Utah Flood Survey photograph collection
P0208n01_01_100-101
19
Haights Creek Diversion dam in process of construction
P0208 Utah Flood Survey photograph collection
P0208n01_01_102
20
Chalk Creek before control, looking up stream during period of highwater in spring, when stream was carrying large quantities of gravel [and] Looking up stream across north end of Fillmore barrier, first season of operation
P0208 Utah Flood Survey photograph collection
P0208n01_01_103-104
21
Kessler Canyon main spillway structure
P0208 Utah Flood Survey photograph collection
P0208n01_01_111
1
-
25
of
21