1 - 25 of 73
Number of results to display per page
TitleDateType
1 Ammunition (lgloo) storage area1966; 1967Image/StillImage
2 Ammunition stored in igloo1966; 1967Image/StillImage
3 Ammunition workshop area -- Storage area in background1966; 1967Image/StillImage
4 Barrel storage [01]1942; 1943; 1944; 1945Image/StillImage
5 Barrel storage [02]1942; 1943; 1944; 1945Image/StillImage
6 Base laundry room [01]1942; 1943; 1944; 1945Image/StillImage
7 Base laundry room [02]1942; 1943; 1944; 1945Image/StillImage
8 Buildings and people during winter storm [01]1942; 1943; 1944; 1945Image/StillImage
9 Buildings and people during winter storm [02]1942; 1943; 1944; 1945Image/StillImage
10 Buildings and people during winter storm [03]1942; 1943; 1944; 1945Image/StillImage
11 Buildings and people during winter storm [04]1942; 1943; 1944; 1945Image/StillImage
12 Combat vehicle rebuild line1966; 1967Image/StillImage
13 Crater formed by detonation of 10,000 lbs of high explosives1944; 1945; 1946Image/StillImage
14 Dehumidified tank storage1966; 1967Image/StillImage
15 Demolition range where unserviceable ammunition is destroyed1966; 1967Image/StillImage
16 Deseret Depot actvity : located in Rush Valley, 17 miles south of the main area of Tooele Army Depot1966; 1967Image/StillImage
17 Empty rails for barrel storage [01]1942; 1943; 1944; 1945Image/StillImage
18 Empty rails for barrel storage [02]1942; 1943; 1944; 1945Image/StillImage
19 Engine and transmission rebuild1966; 1967Image/StillImage
20 Facilities for casting and storing of high explosives1944; 1945; 1946Image/StillImage
21 Family housing and barracks [01]1942; 1943; 1944; 1945Image/StillImage
22 Family housing and barracks [02]1942; 1943; 1944; 1945Image/StillImage
23 Family housing and barracks [03]1942; 1943; 1944; 1945Image/StillImage
24 Family housing and barracks [04]1942; 1943; 1944; 1945Image/StillImage
25 Final assembly of Nike Hercules missile1966; 1967Image/StillImage
1 - 25 of 73