USHS_PR_Cost EstimateProvo River

Update item information
Title USHS_PR_Cost EstimateProvo River
Date 2002-04-16
Subject Civilian Conservation Corps (U.S.)
Description COST ESTIMATE REMEDIAL SAFETY MEASURES SHOP UNIT ITEM DESCRIPTION QUANTITY UNIT PRICE AMOUNT 1 Shear Wall Sheathing 576 SQFT 1.25 720 2 Holdowns 8 EACH 25.00 200 3 Foundation Concrete 15.5 CU YD 300.00 4,650 4 Roof Shoring 1440 SQFT 1.00 1,440 5 Electricity Disconnect 1 LS 500.00 500 6 Shoring and Jacking 1 LS 3,000.00 3,000 7 Remove 1956 Structure 1 LS 10,000.00 10,000 8 Fire Protection, Sprinker 1440 SQFT 3.24 4,666 TOTAL FIELD COSTS $25,200 COST ESTIMATE REMEDIAL SAFETY MEASURES SOUTH GARAGE UNIT ITEM DESCRIPTION QUANTITY UNIT PRICE AMOUNT 1 Shear Wall Sheathing 1024 SQFT 1.25 1,280 2 Holdowns 12 EACH 25.00 300 3 Foundation Concrete 26 CUYD 300.00 7,800 4 Roof Shoring 2496 SQFT 1.00 2,496 5 Electricity Disconnect 1 LS 500.00 500 6 Shoring and Jacking 1 LS 4,000.00 4,000 7 Fire Protection, Sprinker 2496 SQFT 3.24 8,087 TOTAL FIELD COSTS $24,500 ( COST ESTIMATE REMEDIAL SAFETY MEASURES EAST GARAGE UNIT ITEM DESCRIPTION QUANTITY UNIT PRICE AMOUNT 1 Shear Wall Sheathing 1080 SQFT 1.25 1,350 2 Holdowns 12 EACH 25.00 300 3 Foundation Concrete 17 CUYD 300.00 5,100 4 Roof Shoring 1440 SQFT 1.00 1,440 5 Electricity Disconnect 1 LS 500.00 500 6 Shoring and Jacking 1 LS 3,000.00 3,000 7 Fire Protection, Sprinker 1440 SQFT 3.24 4,666 TOTAL FIELD COSTS $16,400 TOTAL FIELD PROJECT COSTS OVERHEAD AND PROFIT 15% $121,600 $18,240 OVERALL TOTAL COST $139,840
Rights Management Digital Image © 2003 Utah State Historical Society. All Rights Reserved.
Type Text
Format image/jpeg
ARK ark:/87278/s6z60m5z
Setname dha_ccc
Date Created 2004-06-28
Date Modified 2004-06-28
ID 428679
Reference URL https://collections.lib.utah.edu/ark:/87278/s6z60m5z
Back to Search Results