Steinaker Dam Construction

Update Item Information
Title Steinaker Dam Construction
Identifier P325-418-1161
Subject Dam--Steinaker Dam-Construction; Canals-Feeder Canals-Steinaker Feeder Canal; Central Utah Water Project
Description Ashley Creek about one mile upstream from the mouth of Dry Fork Canyon. The peak flow had been oer the banks on both sides of the stream. Flow was estimated to be 700 c.f.s. at the time of the picture.
Publisher Uintah County Regional History Center
Contributors By permission of the Bureau of Reclamation of the United States Government
Date 1965-06-12
Type Image/StillImage
Format image/jpeg
Language eng
Rights Management Digital Image, Copyright 2018 Uintah County Regional History Center
Holding Institution Uintah County Regional History Center
Bit Depth 8
Archival Resolution 5530 X 4368 pixels, 1200 dpi.
Scanning Technician Ellen S. Kiever
Scanning Device Epson Perfection 4990 Photo Scanner
Spatial Coverage Vernal (Utah)
ARK ark:/87278/s6575p5w
Setname ucl_rhc
ID 1391098
Reference URL https://collections.lib.utah.edu/ark:/87278/s6575p5w
Back to Search Results