Steinaker Dam Construction

Update Item Information
Title Steinaker Dam Construction
Identifier P325-418-0576
Subject Dam--Steinaker Dam--Construction; Central Utah Water Project
Description Farm Ditch 3 relocation, looking upstream. The notch in bank, at lower left, is at station 10+90, end was caused by overflow of the bank. Erosion of the ditch banks and bottom followed the washout.; ]
Publisher Uintah County Regional History Center
Contributors By permission of the Bureau of Reclamation of the United States Government
Date 1961-08-10
Type Image/StillImage
Format image/jpeg
Language eng
Rights Management Digital Image, Copyright 2018 Uintah County Regional History Center
Holding Institution Bureau of Reclamation
Bit Depth 8
Archival Resolution 5439 x 4331 pixels, 1200 dpi,
Scanning Technician Elaine Carr
Scanning Device Epson Perfection 4870 Photo Scanner
Spatial Coverage Vernal (Utah)
ARK ark:/87278/s6n91ktp
Setname ucl_rhc
ID 1379122
Reference URL https://collections.lib.utah.edu/ark:/87278/s6n91ktp
Back to Search Results