Title |
Steinaker Dam Construction |
Identifier |
P325-418-0525 |
Subject |
Dam--Steinaker Dam--Construction; Central Utah Water Project |
Description |
Drop structure at Station 101+50 showing where backfill was washed from right end of wall and riprap subsidence occurred during initial priming of canal on May 28, 1961. Maximum flow during this priming was 33 c.f.s. |
Publisher |
Uintah County Regional History Center |
Contributors |
By permission of the Bureau of Reclamation of the United States Government |
Date |
1961-06-01 |
Type |
Image/StillImage |
Format |
image/jpeg |
Language |
eng |
Rights Management |
Digital Image, Copyright 2018 Uintah County Regional History Center |
Holding Institution |
Bureau of Reclamation |
Bit Depth |
8 |
Archival Resolution |
5566 X 4367 pixels, 1200 dpi. |
Scanning Technician |
Ellen S. Kiever |
Scanning Device |
Epson Perfection 4990 Photo Scanner |
Spatial Coverage |
Vernal (Utah) |
ARK |
ark:/87278/s6np6dfc |
Setname |
ucl_rhc |
ID |
1379060 |
Reference URL |
https://collections.lib.utah.edu/ark:/87278/s6np6dfc |