Steinaker Dam Construction

Update Item Information
Title Steinaker Dam Construction
Identifier P325-418-0521
Subject Dam--Steinaker Dam--Construction; Central Utah Water Project
Description Drop structure at Station 96+80, showing conditions after backfill was washed from right end of wall, and riprap had subsided on May 28, 1961. Maximum flow during this priming was 33 c.f.s.
Publisher Uintah County Regional History Center
Contributors By permission of the Bureau of Reclamation of the United States Government
Date 1961-06-01
Type Image/StillImage
Format image/jpeg
Language eng
Rights Management Digital Image, Copyright 2018 Uintah County Regional History Center
Holding Institution Bureau of Reclamation
Bit Depth 8
Archival Resolution 4367 x 5512 pixels, 1200 dpi,
Scanning Technician Ellen S. Kiever
Spatial Coverage Vernal (Utah)
ARK ark:/87278/s6f80nm7
Setname ucl_rhc
ID 1379054
Reference URL https://collections.lib.utah.edu/ark:/87278/s6f80nm7
Back to Search Results