Steinaker Dam Construction

Update Item Information
Title Steinaker Dam Construction
Identifier P325-418-0517
Subject Dam--Steinaker Dam--Construction; Central Utah Water Project
Description Looking upstream at drop structure, Station 89+50. Note subsidence of riprap below weir sections. theis subsidence occurred during initial priming of canal on May 27-28, 1961. Maximum flow during this priming was 33 C.F.S.
Publisher Uintah County Regional History Center
Contributors By permission of the Bureau of Reclamation of the United States Government
Date 1961-06-01
Type Image/StillImage
Format image/jpeg
Language eng
Rights Management Digital Image, Copyright 2018 Uintah County Regional History Center
Holding Institution Bureau of Reclamation
Bit Depth 8
Archival Resolution 5548 X 4367 pixels, 1200 dpi.
Scanning Technician Ellen S. Kiever
Spatial Coverage Vernal (Utah)
ARK ark:/87278/s6z64z3q
Setname ucl_rhc
ID 1379050
Reference URL https://collections.lib.utah.edu/ark:/87278/s6z64z3q
Back to Search Results